| Assessment Year | 1997 |
|---|---|
| SIC | 2051 |
| SIC Description | Bread, Cake, And Related Products |
| NAICS | |
| NAICS Description | |
| Principal Product | Bread and Rolls |
| Sales | $ 10,000,000 |
| # of Employees | 150 |
| Plant Area (Sq.Ft.) | 23,825 |
| Annual Production | 91,000 Pieces |
| Production Hrs. Annual | 7,980 |
| Location (State) | RI |
| Yearly Energy Cost | $ 211,708 |
| Energy Sources | Yearly Usage | Yearly Cost | Unit Price |
|---|---|---|---|
Electricity |
1,164,420 kWh | $ 93,059 | $ 0.080 /kWh |
- Demand Charge |
2,594 kW | $ 12,837 | $ 4.95 /kW |
- Electricity Fees |
- | $ 0 | - |
Natural Gas |
17,859 MMBtu | $ 105,812 | $ 5.92 /MMBtu |
TOTAL ENERGY |
29,794 MMBtu | $ 211,708 | $ 7.11 /MMBtu |
Other Liquid (non-haz) |
360 Gal | $ 4,800 | $ 0 /Gal |
Solid Waste (non-haz) |
492,750 lbs | $ 6,300 | $ 0 /lbs |
|
Recommended Implemented |
| Energy Sources | Yearly Savings | Yearly Cost | % Saved | Unit Price |
|---|---|---|---|---|
Electricity |
10,551 kWh 0 kWh |
$ 772 $ 0 |
0.83 % 0.00 % |
$ 0.080 /kWh |
- Demand Charge |
3,233 kW 0 kW |
$ 1,744 $ 0 |
13.59 % 0.00 % |
$ 4.95 /kW |
- Electricity Fees |
- |
$ 0 $ 0 |
0.00 % 0.00 % |
- |
Natural Gas |
417 MMBtu 0 MMBtu |
$ 1,530 $ 0 |
1.45 % 0.00 % |
$ 5.92 /MMBtu |
TOTAL ENERGY |
525 MMBtu 0 MMBtu |
$ 4,046 $ 0 |
1.91 % 0.00 % |
$ 7.11 /MMBtu |
Other Liquid (non-haz) |
360 Gal 0 Gal |
$ 4,800 $ 0 |
100.00 % 0.00 % |
$ 0 /Gal |
Solid Waste (non-haz) |
492,750 lbs 492,750 lbs |
$ 6,300 $ 6,300 |
100.00 % 100.00 % |
$ 0 /lbs |
| AR # | Description | ARC Code | Status | Cost | Savings | Payback (Years) |
|||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 01 | view details |
SELL / OFFER BY-PRODUCT AS ANIMAL FEED | 3.5317 | I | $ 0 | $ 6,300 | 0.00 | ||||||||||||
|
|||||||||||||||||||
| 02 | view details |
USE MAGNETIC TECHNOLOGY TO TREAT WATER | 3.4145 | N | $ 7,335 | $ 4,800 | 1.53 | ||||||||||||
|
|||||||||||||||||||
| 03 | view details |
OPTIMIZE PLANT POWER FACTOR | 2.3212 | N | $ 1,890 | $ 1,744 | 1.08 | ||||||||||||
|
|||||||||||||||||||
| 04 | view details |
USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT COMBUSTION AIR | 2.2411 | N | $ 4,709 | $ 1,530 | 3.08 | ||||||||||||
|
|||||||||||||||||||
| 05 | view details |
INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | 2.4221 | N | $ 572 | $ 772 | 0.74 | ||||||||||||
|
|||||||||||||||||||