| Assessment Year | 1991 |
|---|---|
| SIC | 3069 |
| SIC Description | Fabricated Rubber Products, Nec |
| NAICS | |
| NAICS Description | |
| Principal Product | LATEX FOAM MATTRESSES |
| Sales | $ 9,500,000 |
| # of Employees | 119 |
| Plant Area (Sq.Ft.) | 0 |
| Annual Production | 19,000,000 Pounds |
| Production Hrs. Annual | 6,000 |
| Location (State) | CT |
| Yearly Energy Cost | $ 717,745 |
| Energy Sources | Yearly Usage | Yearly Cost | Unit Price |
|---|---|---|---|
Electricity |
5,998,828 kWh | $ 506,670 | $ 0.084 /kWh |
- Electricity Fees |
- | $ 0 | - |
Natural Gas |
48,541 MMBtu | $ 122,795 | $ 2.53 /MMBtu |
Fuel Oil #6 |
4,134,248 MMBtu | $ 88,280 | $ 0.02 /MMBtu |
TOTAL ENERGY |
4,244,277 MMBtu | $ 717,745 | $ 0.17 /MMBtu |
|
Recommended Implemented |
| Energy Sources | Yearly Savings | Yearly Cost | % Saved | Unit Price |
|---|---|---|---|---|
Electricity |
235,639 kWh 190,211 kWh |
$ 19,908 $ 16,072 |
3.93 % 3.17 % |
$ 0.084 /kWh |
- Electricity Fees |
- |
$ 0 $ 0 |
0.00 % 0.00 % |
- |
Natural Gas |
17,181 MMBtu 167 MMBtu |
$ 50,990 $ 458 |
41.52 % 0.37 % |
$ 2.53 /MMBtu |
Fuel Oil #6 |
-9,274 MMBtu 0 MMBtu |
$ -23,463 $ 0 |
-26.58 % 0.00 % |
$ 0.02 /MMBtu |
TOTAL ENERGY |
10,322 MMBtu 2,116 MMBtu |
$ 47,435 $ 16,530 |
6.61 % 2.30 % |
$ 0.17 /MMBtu |
| AR # | Description | ARC Code | Status | Cost | Savings | Payback (Years) |
|||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 01 | view details |
CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS | 2.1332 | N | $ 0 | $ 27,069 | 0.00 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 02 | view details |
USE HIGHEST TEMPERATURE FOR CHILLING OR COLD STORAGE | 2.2694 | I | $ 5,000 | $ 8,647 | 0.58 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 03 | view details |
USE MULTIPLE SPEED MOTORS OR AFD FOR VARIABLE PUMP, BLOWER AND COMPRESSOR LOADS | 2.4141 | I | $ 2,000 | $ 6,534 | 0.31 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 04 | view details |
UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | 2.7142 | N | $ 15,000 | $ 3,585 | 4.18 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 05 | view details |
INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | 2.4221 | I | $ 400 | $ 891 | 0.45 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 06 | view details |
INSULATE BARE EQUIPMENT | 2.2511 | I | $ 430 | $ 458 | 0.94 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||