Industrial Assessment Centers
Assessment #LL0356
| Assessment Year | 2011 |
|---|---|
| SIC | 2026 |
| SIC Description | Fluid Milk |
| NAICS | 311514 |
| NAICS Description | Dry, Condensed, and Evaporated Dairy Product Manufacturing |
| Principal Product | milk |
| Sales | $ 23,500,000 |
| # of Employees | 252 |
| Plant Area (Sq.Ft.) | 40,000 |
| Annual Production | 22,000 Thousand Gallons |
| Production Hrs. Annual | 8,736 |
| Location (State) | LA |
| Yearly Energy Cost | $ 670,373 |
Current Energy Usage & Costs
| Energy Sources | Yearly Usage | Yearly Cost | Unit Price |
|---|---|---|---|
Electricity |
7,634,800 kWh | $ 563,247 | $ 0.074 /kWh |
- Electricity Fees |
- | $ 0 | - |
Natural Gas |
15,930 MMBtu | $ 107,126 | $ 6.72 /MMBtu |
TOTAL ENERGY |
94,187 MMBtu | $ 670,373 | $ 7.12 /MMBtu |
Water Disposal |
33,264,500 Gal | $ 253,303 | $ 0 /Gal |
Recommended Reduction in Usage & Costs
|
Recommended Implemented |
| Energy Sources | Yearly Savings | Yearly Cost | % Saved | Unit Price |
|---|---|---|---|---|
Electricity |
282,739 kWh 149,382 kWh |
$ 21,135 $ 11,166 |
3.75 % 1.98 % |
$ 0.074 /kWh |
- Electricity Fees |
- |
$ 0 $ 0 |
0.00 % 0.00 % |
- |
Natural Gas |
5,169 MMBtu 3,847 MMBtu |
$ 34,739 $ 25,855 |
32.43 % 24.14 % |
$ 6.72 /MMBtu |
TOTAL ENERGY |
8,067 MMBtu 5,378 MMBtu |
$ 55,874 $ 37,021 |
8.33 % 5.52 % |
$ 7.12 /MMBtu |
Water Disposal |
2,168,288 Gal 2,168,288 Gal |
$ 16,522 $ 16,522 |
6.52 % 6.52 % |
$ 0 /Gal |
Recommendations
| AR # | Description | ARC Code | Status | Cost | Savings | Payback (Years) |
|||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 01 | view details |
INCREASE AMOUNT OF CONDENSATE RETURNED | 2.2121 | I | $ 89,664 | $ 35,965 | 2.49 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 02 | view details |
INSULATE BARE EQUIPMENT | 2.2511 | I | $ 840 | $ 9,420 | 0.09 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 03 | view details |
PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT | 2.2441 | N | $ 30,300 | $ 8,884 | 3.41 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 04 | view details |
REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | 2.4231 | N | $ 30 | $ 7,032 | 0.00 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 05 | view details |
INSULATE BARE EQUIPMENT | 2.2511 | I | $ 1,127 | $ 6,412 | 0.18 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 06 | view details |
BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | 4.611 | N | $ 1,291 | $ 5,817 | 0.22 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 07 | view details |
UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | 2.7142 | N | $ 5,460 | $ 1,939 | 2.82 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 08 | view details |
ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | 2.4236 | I | $ 360 | $ 1,666 | 0.22 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 09 | view details |
USE MORE EFFICIENT LIGHT SOURCE | 2.7143 | N | $ 455 | $ 717 | 0.63 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 10 | view details |
CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | 2.6211 | N | $ 375 | $ 261 | 1.44 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 11 | view details |
INSTALL OCCUPANCY SENSORS | 2.7135 | N | $ 480 | $ 256 | 1.88 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 12 | view details |
UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | 2.7142 | N | $ 65 | $ 158 | 0.41 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 13 | view details |
REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | 2.7224 | I | $ 66 | $ 80 | 0.83 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||