Industrial Assessment Centers
Assessment #LL0345
| Assessment Year | 2011 |
|---|---|
| SIC | 3533 |
| SIC Description | Oil And Gas Field Machinery |
| NAICS | 333132 |
| NAICS Description | Oil and Gas Field Machinery and Equipment Manufacturing |
| Principal Product | Oil tools |
| Sales | $ 70,000,000 |
| # of Employees | 500 |
| Plant Area (Sq.Ft.) | 80,000 |
| Annual Production | 7,200,000 Pieces |
| Production Hrs. Annual | 2,600 |
| Location (State) | LA |
| Yearly Energy Cost | $ 260,491 |
Current Energy Usage & Costs
| Energy Sources | Yearly Usage | Yearly Cost | Unit Price |
|---|---|---|---|
Electricity |
2,572,315 kWh | $ 253,446 | $ 0.099 /kWh |
- Electricity Fees |
- | $ 0 | - |
Natural Gas |
893 MMBtu | $ 7,045 | $ 7.89 /MMBtu |
TOTAL ENERGY |
27,259 MMBtu | $ 260,491 | $ 9.56 /MMBtu |
Recommended Reduction in Usage & Costs
|
Recommended Implemented |
| Energy Sources | Yearly Savings | Yearly Cost | % Saved | Unit Price |
|---|---|---|---|---|
Electricity |
2,081,636 kWh 1,754,066 kWh |
$ 205,104 $ 172,828 |
80.93 % 68.19 % |
$ 0.099 /kWh |
- Electricity Fees |
- |
$ 0 $ 0 |
0.00 % 0.00 % |
- |
Natural Gas |
0 MMBtu 0 MMBtu |
$ 0 $ 0 |
0.00 % 0.00 % |
$ 7.89 /MMBtu |
TOTAL ENERGY |
21,337 MMBtu 17,979 MMBtu |
$ 205,104 $ 172,828 |
78.74 % 66.35 % |
$ 9.56 /MMBtu |
Recommendations
| AR # | Description | ARC Code | Status | Cost | Savings | Payback (Years) |
|||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 01 | view details |
ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | 2.4236 | I | $ 126,720 | $ 172,828 | 0.73 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 02 | view details |
BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | 4.611 | I | $ 4,660 | $ 44,703 | 0.10 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 03 | view details |
USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | 2.7133 | N | $ 1,530 | $ 14,141 | 0.11 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 04 | view details |
USE PHOTOCELL CONTROLS | 2.7134 | N | $ 330 | $ 6,770 | 0.05 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 05 | view details |
BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | 4.611 | N | $ 840 | $ 3,985 | 0.21 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 06 | view details |
INSTALL OCCUPANCY SENSORS | 2.7135 | N | $ 4,260 | $ 3,331 | 1.28 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 07 | view details |
USE MORE EFFICIENT LIGHT SOURCE | 2.7143 | N | $ 1,330 | $ 2,394 | 0.56 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 08 | view details |
REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | 2.7111 | N | $ 1,210 | $ 2,296 | 0.53 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 09 | view details |
REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | 2.4231 | N | $ 15 | $ 1,578 | 0.01 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 10 | view details |
UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | 2.7142 | N | $ 123 | $ 432 | 0.28 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||