Assessment #LE0304
| Assessment Year | 2010 |
|---|---|
| SIC | 3599 |
| SIC Description | Industrial Machinery, Nec |
| NAICS | 332710 |
| NAICS Description | Machine Shops |
| Principal Product | elevator and mining parts |
| Sales | $ 39,000,000 |
| # of Employees | 121 |
| Plant Area (Sq.Ft.) | 143,550 |
| Annual Production | 1 Not Available |
| Production Hrs. Annual | 4,160 |
| Location (State) | PA |
| Yearly Energy Cost | $ 216,129 |
Current Energy Usage & Costs
| Energy Sources | Yearly Usage | Yearly Cost | Unit Price |
|---|---|---|---|
Electricity |
1,912,957 kWh | $ 93,132 | $ 0.049 /kWh |
- Demand Charge |
4,319 kW | $ 27,391 | $ 6.34 /kW |
- Electricity Fees |
- | $ 0 | - |
Natural Gas |
6,293 MMBtu | $ 95,606 | $ 15.19 /MMBtu |
TOTAL ENERGY |
25,901 MMBtu | $ 216,129 | $ 8.34 /MMBtu |
Recommended Reduction in Usage & Costs
|
Recommended Implemented |
| Energy Sources | Yearly Savings | Yearly Cost | % Saved | Unit Price |
|---|---|---|---|---|
Electricity |
744,831 kWh 442,802 kWh |
$ 36,495 $ 21,696 |
39.19 % 23.30 % |
$ 0.049 /kWh |
- Demand Charge |
2,913 kW 1,080 kW |
$ 18,469 $ 6,845 |
67.43 % 24.99 % |
$ 6.34 /kW |
- Electricity Fees |
- |
$ 0 $ 0 |
0.00 % 0.00 % |
- |
Natural Gas |
4,193 MMBtu 0 MMBtu |
$ 63,691 $ 0 |
66.62 % 0.00 % |
$ 15.19 /MMBtu |
TOTAL ENERGY |
11,828 MMBtu 4,539 MMBtu |
$ 118,655 $ 28,541 |
54.90 % 13.21 % |
$ 8.34 /MMBtu |
Recommendations
| AR # | Description | ARC Code | Status | Cost | Savings | Payback (Years) |
|||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 01 | view details |
USE RADIANT HEATER FOR SPOT HEATING | 2.7231 | N | $ 40,932 | $ 300,000 | 0.14 | ||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||
| 02 | view details |
USE RADIANT HEATER FOR SPOT HEATING | 2.7231 | N | $ 39,415 | $ 55,099 | 0.72 | ||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||
| 03 | view details |
USE / PURCHASE OPTIMUM SIZED COMPRESSOR | 2.4226 | N | $ 18,000 | $ 16,822 | 1.07 | ||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||
| 04 | view details |
USE / PURCHASE OPTIMUM SIZED COMPRESSOR | 2.4226 | N | $ 100,000 | $ 15,355 | 6.51 | ||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||
| 05 | view details |
INSTALL TIMERS AND/OR THERMOSTATS | 2.7261 | I | $ 30 | $ 12,804 | 0.00 | ||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||
| 06 | view details |
RECOVER HEAT FROM AIR COMPRESSOR | 2.2434 | N | $ 15,000 | $ 8,592 | 1.75 | ||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||
| 07 | view details |
ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | 2.4236 | I | $ 273 | $ 7,396 | 0.04 | ||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||
| 08 | view details |
RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | 2.3131 | N | $ 0 | $ 1,370 | 0.00 | ||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||
| 09 | view details |
USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | 2.4323 | N | $ 5,740 | $ 1,073 | 5.35 | ||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||
| 10 | view details |
INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | 2.4221 | N | $ 2,400 | $ 803 | 2.99 | ||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||
| 11 | view details |
UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | 2.7142 | I | $ 14,758 | $ 5,692 | 2.59 | ||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||
| 12 | view details |
UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | 2.7142 | I | $ 11,654 | $ 3,240 | 3.60 | ||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||