Industrial Assessment Centers
Assessment #LE0303
| Assessment Year | 2010 |
|---|---|
| SIC | 2653 |
| SIC Description | Corrugated And Solid Fiber Boxes |
| NAICS | 322211 |
| NAICS Description | Corrugated and Solid Fiber Box Manufacturing |
| Principal Product | secondary co-packer |
| Sales | $ 81,000,000 |
| # of Employees | 200 |
| Plant Area (Sq.Ft.) | 124,000 |
| Annual Production | 1,000 Not Available |
| Production Hrs. Annual | 4,160 |
| Location (State) | PA |
| Yearly Energy Cost | $ 161,730 |
Current Energy Usage & Costs
| Energy Sources | Yearly Usage | Yearly Cost | Unit Price |
|---|---|---|---|
Electricity |
1,120,000 kWh | $ 80,178 | $ 0.072 /kWh |
- Demand Charge |
3,187 kW | $ 27,430 | $ 8.61 /kW |
- Electricity Fees |
- | $ 0 | - |
Other Gas |
2,429 MMBtu | $ 54,122 | $ 22.28 /MMBtu |
TOTAL ENERGY |
13,909 MMBtu | $ 161,730 | $ 11.63 /MMBtu |
Recommended Reduction in Usage & Costs
|
Recommended Implemented |
| Energy Sources | Yearly Savings | Yearly Cost | % Saved | Unit Price |
|---|---|---|---|---|
Electricity |
597,595 kWh 454,200 kWh |
$ 43,026 $ 32,701 |
53.66 % 40.79 % |
$ 0.072 /kWh |
- Demand Charge |
1,117 kW 772 kW |
$ 9,620 $ 6,649 |
35.07 % 24.24 % |
$ 8.61 /kW |
- Electricity Fees |
- |
$ 0 $ 0 |
0.00 % 0.00 % |
- |
Other Gas |
165 MMBtu 44 MMBtu |
$ 3,678 $ 973 |
6.80 % 1.80 % |
$ 22.28 /MMBtu |
TOTAL ENERGY |
6,292 MMBtu 4,700 MMBtu |
$ 56,324 $ 40,323 |
34.83 % 24.93 % |
$ 11.63 /MMBtu |
Recommendations
| AR # | Description | ARC Code | Status | Cost | Savings | Payback (Years) |
|||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 01 | view details |
ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | 2.4236 | I | $ 1,672 | $ 26,348 | 0.06 | ||||||||||||||||
|
|||||||||||||||||||||||
| 02 | view details |
INSTALL TIMERS AND/OR THERMOSTATS | 2.7261 | I | $ 650 | $ 10,520 | 0.06 | ||||||||||||||||
|
|||||||||||||||||||||||
| 03 | view details |
USE ADJUSTABLE FREQUENCY DRIVE TO REPLACE MOTOR-GENERATOR SET | 2.4142 | N | $ 1,500 | $ 4,909 | 0.31 | ||||||||||||||||
|
|||||||||||||||||||||||
| 04 | view details |
REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | 2.4231 | N | $ 2,200 | $ 3,385 | 0.65 | ||||||||||||||||
|
|||||||||||||||||||||||
| 05 | view details |
MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE | 2.7312 | N | $ 7,000 | $ 2,574 | 2.72 | ||||||||||||||||
|
|||||||||||||||||||||||
| 06 | view details |
ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | 2.4236 | N | $ 25,900 | $ 1,931 | 13.41 | ||||||||||||||||
|
|||||||||||||||||||||||
| 07 | view details |
USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | 2.4323 | N | $ 3,000 | $ 1,824 | 1.64 | ||||||||||||||||
|
|||||||||||||||||||||||
| 08 | view details |
RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | 2.3131 | N | $ 3,000 | $ 1,378 | 2.18 | ||||||||||||||||
|
|||||||||||||||||||||||
| 09 | view details |
INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | 2.4221 | I | $ 800 | $ 1,351 | 0.59 | ||||||||||||||||
|
|||||||||||||||||||||||
| 10 | view details |
REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | 2.4231 | I | $ 15 | $ 1,131 | 0.01 | ||||||||||||||||
|
|||||||||||||||||||||||
| 11 | view details |
RECOVER HEAT FROM AIR COMPRESSOR | 2.2434 | I | $ 1,000 | $ 973 | 1.03 | ||||||||||||||||
|
|||||||||||||||||||||||