Industrial Assessment Centers
Assessment #LE0293
| Assessment Year | 2009 |
|---|---|
| SIC | 3291 |
| SIC Description | Abrasive Products |
| NAICS | 327910 |
| NAICS Description | Abrasive Product Manufacturing |
| Principal Product | Industrial wire brushes |
| Sales | $ 65,000,000 |
| # of Employees | 362 |
| Plant Area (Sq.Ft.) | 220,500 |
| Annual Production | 1,000,000 Not Available |
| Production Hrs. Annual | 6,240 |
| Location (State) | PA |
| Yearly Energy Cost | $ 414,863 |
Current Energy Usage & Costs
| Energy Sources | Yearly Usage | Yearly Cost | Unit Price |
|---|---|---|---|
Electricity |
4,688,400 kWh | $ 220,203 | $ 0.047 /kWh |
- Demand Charge |
10,556 kW | $ 92,154 | $ 8.73 /kW |
- Electricity Fees |
- | $ 0 | - |
Fuel Oil #4 |
3,953 MMBtu | $ 102,506 | $ 25.93 /MMBtu |
TOTAL ENERGY |
52,009 MMBtu | $ 414,863 | $ 7.98 /MMBtu |
Recommended Reduction in Usage & Costs
|
Recommended Implemented |
| Energy Sources | Yearly Savings | Yearly Cost | % Saved | Unit Price |
|---|---|---|---|---|
Electricity |
603,990 kWh 596,415 kWh |
$ 31,577 $ 31,221 |
14.34 % 14.18 % |
$ 0.047 /kWh |
- Demand Charge |
1,521 kW 1,521 kW |
$ 11,441 $ 11,441 |
12.42 % 12.42 % |
$ 8.73 /kW |
- Electricity Fees |
- |
$ 0 $ 0 |
0.00 % 0.00 % |
- |
Fuel Oil #4 |
0 MMBtu 0 MMBtu |
$ 0 $ 0 |
0.00 % 0.00 % |
$ 25.93 /MMBtu |
TOTAL ENERGY |
6,765 MMBtu 6,687 MMBtu |
$ 57,876 $ 57,520 |
13.95 % 13.86 % |
$ 7.98 /MMBtu |
Recommendations
| AR # | Description | ARC Code | Status | Cost | Savings | Payback (Years) |
|||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 01 | view details |
USE BATCH FIRING WITH KILN "FURNITURE" SPECIFICALLY DESIGNED | 2.2313 | I | $ 15,000 | $ 25,144 | 0.60 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 02 | view details |
ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | 2.4236 | I | $ 1,800 | $ 9,797 | 0.18 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 03 | view details |
USE ADJUSTABLE FREQUENCY DRIVE TO REPLACE MECHANICAL DRIVE | 2.4144 | I | $ 2,932 | $ 4,105 | 0.71 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 04 | view details |
INSTALL OCCUPANCY SENSORS | 2.7135 | I | $ 700 | $ 2,864 | 0.24 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 05 | view details |
INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS | 2.4112 | I | $ 27,600 | $ 1,697 | 16.26 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 06 | view details |
INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | 2.4221 | I | $ 1,675 | $ 717 | 2.34 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 07 | view details |
MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE | 2.7312 | N | $ 2,250 | $ 356 | 6.32 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 08 | view details |
UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | 2.7142 | I | $ 58,455 | $ 13,196 | 4.43 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||