Industrial Assessment Centers
Assessment #LE0289
| Assessment Year | 2009 |
|---|---|
| SIC | 2834 |
| SIC Description | Pharmaceutical Preparations |
| NAICS | 325412 |
| NAICS Description | Pharmaceutical Preparation Manufacturing |
| Principal Product | pharmaceutical |
| Sales | $ 65,000,000 |
| # of Employees | 250 |
| Plant Area (Sq.Ft.) | 100,000 |
| Annual Production | 10,000,000 Not Available |
| Production Hrs. Annual | 6,240 |
| Location (State) | NJ |
| Yearly Energy Cost | $ 172,405 |
Current Energy Usage & Costs
| Energy Sources | Yearly Usage | Yearly Cost | Unit Price |
|---|---|---|---|
Electricity |
1,295,520 kWh | $ 135,757 | $ 0.105 /kWh |
- Demand Charge |
2,934 kW | $ 27,233 | $ 9.28 /kW |
- Electricity Fees |
- | $ 0 | - |
Natural Gas |
2,721 MMBtu | $ 9,415 | $ 3.46 /MMBtu |
TOTAL ENERGY |
16,000 MMBtu | $ 172,405 | $ 10.78 /MMBtu |
Recommended Reduction in Usage & Costs
|
Recommended Implemented |
| Energy Sources | Yearly Savings | Yearly Cost | % Saved | Unit Price |
|---|---|---|---|---|
Electricity |
635,869 kWh 273,486 kWh |
$ 63,860 $ 25,611 |
47.04 % 18.87 % |
$ 0.105 /kWh |
- Demand Charge |
867 kW 235 kW |
$ 8,041 $ 2,176 |
29.53 % 7.99 % |
$ 9.28 /kW |
- Electricity Fees |
- |
$ 0 $ 0 |
0.00 % 0.00 % |
- |
Natural Gas |
0 MMBtu 0 MMBtu |
$ 0 $ 0 |
0.00 % 0.00 % |
$ 3.46 /MMBtu |
TOTAL ENERGY |
6,518 MMBtu 2,803 MMBtu |
$ 71,901 $ 27,787 |
41.70 % 16.12 % |
$ 10.78 /MMBtu |
Recommendations
| AR # | Description | ARC Code | Status | Cost | Savings | Payback (Years) |
|||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 01 | view details |
REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | 2.1311 | I | $ 20,000 | $ 19,778 | 1.01 | ||||||||||||||||
|
|||||||||||||||||||||||
| 02 | view details |
MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION | 2.6242 | N | $ 2,600 | $ 12,698 | 0.20 | ||||||||||||||||
|
|||||||||||||||||||||||
| 03 | view details |
ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | 2.4236 | N | $ 11,500 | $ 11,495 | 1.00 | ||||||||||||||||
|
|||||||||||||||||||||||
| 04 | view details |
REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | 2.4231 | I | $ 304 | $ 4,121 | 0.07 | ||||||||||||||||
|
|||||||||||||||||||||||
| 05 | view details |
USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | 3.4111 | N | $ 12,000 | $ 3,908 | 3.07 | ||||||||||||||||
|
|||||||||||||||||||||||
| 06 | view details |
ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | 2.4236 | I | $ 2,824 | $ 3,888 | 0.73 | ||||||||||||||||
|
|||||||||||||||||||||||
| 07 | view details |
USE SOLAR HEAT TO HEAT WATER | 2.9112 | N | $ 3,640 | $ 1,380 | 2.64 | ||||||||||||||||
|
|||||||||||||||||||||||
| 08 | view details |
UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | 2.7142 | N | $ 16,830 | $ 9,474 | 1.78 | ||||||||||||||||
|
|||||||||||||||||||||||
| 09 | view details |
UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | 2.7142 | N | $ 6,137 | $ 2,333 | 2.63 | ||||||||||||||||
|
|||||||||||||||||||||||
| 10 | view details |
UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | 2.7142 | N | $ 18,122 | $ 6,734 | 2.69 | ||||||||||||||||
|
|||||||||||||||||||||||