| Assessment Year | 2008 |
|---|---|
| SIC | 2086 |
| SIC Description | Bottled And Canned Soft Drinks |
| NAICS | 312112 |
| NAICS Description | Bottled Water Manufacturing |
| Principal Product | bottled water |
| Sales | $ 62,000,000 |
| # of Employees | 322 |
| Plant Area (Sq.Ft.) | 385,000 |
| Annual Production | 454,272,000 Not Available |
| Production Hrs. Annual | 8,736 |
| Location (State) | PA |
| Yearly Energy Cost | $ 5,252,625 |
Current Energy Usage & Costs
| Energy Sources | Yearly Usage | Yearly Cost | Unit Price |
|---|---|---|---|
Electricity |
70,230,247 kWh | $ 3,613,312 | $ 0.051 /kWh |
- Demand Charge |
117,030 kW | $ 823,235 | $ 7.03 /kW |
- Electricity Fees |
- | $ 0 | - |
Natural Gas |
98,061 MMBtu | $ 816,078 | $ 8.32 /MMBtu |
TOTAL ENERGY |
817,921 MMBtu | $ 5,252,625 | $ 6.42 /MMBtu |
Recommended Reduction in Usage & Costs
|
Recommended Implemented |
| Energy Sources | Yearly Savings | Yearly Cost | % Saved | Unit Price |
|---|---|---|---|---|
Electricity |
4,245,075 kWh 885,567 kWh |
$ 216,807 $ 45,472 |
6.00 % 1.26 % |
$ 0.051 /kWh |
- Demand Charge |
11,463 kW 7,068 kW |
$ 80,587 $ 49,689 |
9.79 % 6.04 % |
$ 7.03 /kW |
- Electricity Fees |
- |
$ 0 $ 0 |
0.00 % 0.00 % |
- |
Natural Gas |
7,565 MMBtu 4,945 MMBtu |
$ 62,939 $ 41,144 |
7.71 % 5.04 % |
$ 8.32 /MMBtu |
TOTAL ENERGY |
51,077 MMBtu 14,022 MMBtu |
$ 360,333 $ 136,305 |
6.86 % 2.59 % |
$ 6.42 /MMBtu |
Recommendations
| AR # | Description | ARC Code | Status | Cost | Savings | Payback (Years) |
|||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 01 | view details |
REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | 4.6520 | N | $ 200,000 | $ 198,263 | 1.01 | ||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||
| 02 | view details |
RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | 2.3131 | I | $ 6,000 | $ 41,140 | 0.15 | ||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||
| 03 | view details |
USE ADJUSTABLE FREQUENCY DRIVE TO REPLACE MOTOR-GENERATOR SET | 2.4142 | I | $ 30,000 | $ 36,169 | 0.83 | ||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||
| 04 | view details |
REPAIR OR REPLACE STEAM TRAPS | 2.2113 | I | $ 2,000 | $ 31,944 | 0.06 | ||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||
| 05 | view details |
PREHEAT COMBUSTION AIR WITH WASTE HEAT | 2.2442 | N | $ 30,000 | $ 21,795 | 1.38 | ||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||
| 06 | view details |
CHANGE PRODUCT DESIGN TO REDUCE ENERGY REQUIREMENTS | 2.5195 | N | $ 31,435 | $ 26,495 | 1.19 | ||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||
| 07 | view details |
ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | 2.1233 | I | $ 3,000 | $ 9,200 | 0.33 | ||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||
| 08 | view details |
UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | 2.4111 | N | $ 1,500 | $ 8,134 | 0.18 | ||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||
| 09 | view details |
ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | 2.4236 | I | $ 1,000 | $ 4,723 | 0.21 | ||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||
| 10 | view details |
UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | 2.7142 | I | $ 300,000 | $ 13,129 | 22.85 | ||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||