| Assessment Year | 2006 |
|---|---|
| SIC | 2013 |
| SIC Description | Sausages And Other Prepared Meats |
| NAICS | 311613 |
| NAICS Description | Rendering and Meat Byproduct Processing |
| Principal Product | collagen casings |
| Sales | $ 40,000,000 |
| # of Employees | 220 |
| Plant Area (Sq.Ft.) | 145,000 |
| Annual Production | 1,214,000 Thousand Feet |
| Production Hrs. Annual | 8,400 |
| Location (State) | NJ |
| Yearly Energy Cost | $ 3,027,033 |
Current Energy Usage & Costs
| Energy Sources | Yearly Usage | Yearly Cost | Unit Price |
|---|---|---|---|
Electricity |
14,322,644 kWh | $ 1,632,781 | $ 0.114 /kWh |
- Demand Charge |
23,863 kW | $ 111,723 | $ 4.68 /kW |
- Electricity Fees |
- | $ 0 | - |
Natural Gas |
126,243 MMBtu | $ 1,282,529 | $ 10.16 /MMBtu |
TOTAL ENERGY |
273,050 MMBtu | $ 3,027,033 | $ 11.09 /MMBtu |
Recommended Reduction in Usage & Costs
|
Recommended Implemented |
| Energy Sources | Yearly Savings | Yearly Cost | % Saved | Unit Price |
|---|---|---|---|---|
Electricity |
9,239,566 kWh 105,193 kWh |
$ 1,178,168 $ 11,993 |
72.16 % 0.73 % |
$ 0.114 /kWh |
- Demand Charge |
13,870 kW 1,716 kW |
$ 73,432 $ 16,551 |
65.73 % 14.81 % |
$ 4.68 /kW |
- Electricity Fees |
- |
$ 0 $ 0 |
0.00 % 0.00 % |
- |
Natural Gas |
1,585 MMBtu 1,585 MMBtu |
$ 240,770 $ 351,913 |
18.77 % 27.44 % |
$ 10.16 /MMBtu |
TOTAL ENERGY |
96,290 MMBtu 2,663 MMBtu |
$ 1,492,370 $ 380,457 |
49.30 % 12.57 % |
$ 11.09 /MMBtu |
Recommendations
| AR # | Description | ARC Code | Status | Cost | Savings | Payback (Years) |
|||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 01 | view details |
USE SOLAR HEAT TO MAKE ELECTRICTY | 2.9114 | N | $ 2,403,050 | $ 1,077,481 | 2.23 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 02 | view details |
USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | 2.3415 | N | $ 540,000 | $ 902,617 | 0.60 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 03 | view details |
PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER | 2.8113 | I | $ 500 | $ 335,810 | 0.00 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 04 | view details |
REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | 2.1311 | N | $ 17,600 | $ 124,858 | 0.14 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 05 | view details |
ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | 2.1233 | I | $ 2,500 | $ 16,103 | 0.16 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 06 | view details |
RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | 2.3131 | I | $ 3,000 | $ 15,870 | 0.19 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 07 | view details |
USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | 2.4322 | I | $ 45,000 | $ 9,609 | 4.68 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 08 | view details |
USE / PURCHASE OPTIMUM SIZED COMPRESSOR | 2.4226 | N | $ 3,000 | $ 5,409 | 0.55 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 09 | view details |
ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | 2.4236 | N | $ 1,000 | $ 5,223 | 0.19 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 10 | view details |
INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | 2.4221 | N | $ 2,500 | $ 1,471 | 1.70 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 11 | view details |
REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | 2.7111 | I | $ 90 | $ 3,065 | 0.03 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||