Industrial Assessment Centers
Assessment #KU0488
| Assessment Year | 1998 |
|---|---|
| SIC | 3714 |
| SIC Description | Motor Vehicle Parts And Accessories |
| NAICS | |
| NAICS Description | |
| Principal Product | vehicle safety lighting |
| Sales | $ 65,000,000 |
| # of Employees | 468 |
| Plant Area (Sq.Ft.) | 222,500 |
| Annual Production | 30,000,000 Pieces |
| Production Hrs. Annual | 4,375 |
| Location (State) | MO |
| Yearly Energy Cost | $ 294,832 |
Current Energy Usage & Costs
| Energy Sources | Yearly Usage | Yearly Cost | Unit Price |
|---|---|---|---|
Electricity |
4,289,859 kWh | $ 183,147 | $ 0.043 /kWh |
- Demand Charge |
10,628 kW | $ 61,866 | $ 5.82 /kW |
- Electricity Fees |
- | $ 0 | - |
Natural Gas |
11,095 MMBtu | $ 49,819 | $ 4.49 /MMBtu |
TOTAL ENERGY |
55,066 MMBtu | $ 294,832 | $ 5.35 /MMBtu |
Water Disposal |
4,178,887 Gal | $ 17,395 | $ 0 /Gal |
Other Liquid (haz) |
2,800 Gal | $ 10,861 | $ 0 /Gal |
Solid Waste (non-haz) |
1,194,000 lbs | $ 270,847 | $ 0 /lbs |
Solid Waste (haz) |
10,956 lbs | $ 9,593 | $ 0 /lbs |
Recommended Reduction in Usage & Costs
|
Recommended Implemented |
| Energy Sources | Yearly Savings | Yearly Cost | % Saved | Unit Price |
|---|---|---|---|---|
Electricity |
317,409 kWh 299,824 kWh |
$ 13,480 $ 12,740 |
7.36 % 6.96 % |
$ 0.043 /kWh |
- Demand Charge |
868 kW 786 kW |
$ 5,060 $ 4,580 |
8.18 % 7.40 % |
$ 5.82 /kW |
- Electricity Fees |
- |
$ 0 $ 0 |
0.00 % 0.00 % |
- |
Natural Gas |
1,035 MMBtu 1,035 MMBtu |
$ 4,530 $ 4,530 |
9.09 % 9.09 % |
$ 4.49 /MMBtu |
TOTAL ENERGY |
4,288 MMBtu 4,108 MMBtu |
$ 23,070 $ 21,850 |
7.82 % 7.41 % |
$ 5.35 /MMBtu |
Water Disposal |
778,024 Gal 778,024 Gal |
$ 3,760 $ 3,760 |
21.62 % 21.62 % |
$ 0 /Gal |
Other Liquid (haz) |
0 Gal 0 Gal |
$ 0 $ 0 |
0.00 % 0.00 % |
$ 0 /Gal |
Solid Waste (non-haz) |
480,000 lbs 60,000 lbs |
$ 18,090 $ 1,440 |
6.68 % 0.53 % |
$ 0 /lbs |
Solid Waste (haz) |
0 lbs 0 lbs |
$ 0 $ 0 |
0.00 % 0.00 % |
$ 0 /lbs |
Recommendations
| AR # | Description | ARC Code | Status | Cost | Savings | Payback (Years) |
|||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 01 | view details |
USE / PURCHASE OPTIMUM SIZED COMPRESSOR | 2.4226 | I | $ 5,000 | $ 8,600 | 0.58 | ||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||
| 02 | view details |
UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | 2.7142 | I | $ 17,360 | $ 6,940 | 2.50 | ||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||
| 03 | view details |
RECOVER HEAT FROM AIR COMPRESSOR | 2.2434 | I | $ 670 | $ 4,530 | 0.15 | ||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||
| 04 | view details |
INSULATE STEAM / HOT WATER LINES | 2.2131 | I | $ 1,960 | $ 1,660 | 1.18 | ||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||
| 05 | view details |
INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | 2.4221 | N | $ 400 | $ 1,220 | 0.33 | ||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||
| 06 | view details |
UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | 2.7142 | I | $ 420 | $ 310 | 1.35 | ||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||
| 07 | view details |
LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER | 3.5315 | N | $ 5,000 | $ 16,650 | 0.30 | ||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||
| 08 | view details |
USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | 3.4111 | I | $ 120 | $ 3,220 | 0.04 | ||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||
| 09 | view details |
CONTRACT A WOOD PALLET RECYCLING COMPANY | 3.5316 | I | $ 0 | $ 1,440 | 0.00 | ||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||
| 10 | view details |
METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | 3.4116 | I | $ 130 | $ 540 | 0.24 | ||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||