| Assessment Year | 1986 |
|---|---|
| SIC | 2752 |
| SIC Description | Commercial Printing, Lithographic |
| NAICS | |
| NAICS Description | |
| Principal Product | PRINTED PAPER |
| Sales | $ 35,000,000 |
| # of Employees | 250 |
| Plant Area (Sq.Ft.) | 0 |
| Annual Production | 11,000 Tons |
| Production Hrs. Annual | 6,240 |
| Location (State) | MO |
| Yearly Energy Cost | $ 463,331 |
Current Energy Usage & Costs
| Energy Sources | Yearly Usage | Yearly Cost | Unit Price |
|---|---|---|---|
Electricity |
6,458,968 kWh | $ 354,631 | $ 0.055 /kWh |
- Electricity Fees |
- | $ 0 | - |
Natural Gas |
26,456 MMBtu | $ 108,700 | $ 4.11 /MMBtu |
TOTAL ENERGY |
92,660 MMBtu | $ 463,331 | $ 5.00 /MMBtu |
Recommended Reduction in Usage & Costs
|
Recommended Implemented |
| Energy Sources | Yearly Savings | Yearly Cost | % Saved | Unit Price |
|---|---|---|---|---|
Electricity |
6,461,313 kWh 388,042 kWh |
$ 354,720 $ 21,303 |
100.03 % 6.01 % |
$ 0.055 /kWh |
- Electricity Fees |
- |
$ 0 $ 0 |
0.00 % 0.00 % |
- |
Natural Gas |
-52,760 MMBtu 1,055 MMBtu |
$ -216,844 $ 4,336 |
-199.49 % 3.99 % |
$ 4.11 /MMBtu |
TOTAL ENERGY |
13,469 MMBtu 5,033 MMBtu |
$ 137,876 $ 25,639 |
29.76 % 5.53 % |
$ 5.00 /MMBtu |
Recommendations
| AR # | Description | ARC Code | Status | Cost | Savings | Payback (Years) |
|||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 01 | view details |
USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | 2.3415 | N | $ 1,000,000 | $ 109,167 | 9.16 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 02 | view details |
UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | 2.7142 | I | $ 10,000 | $ 14,883 | 0.67 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 03 | view details |
REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | 2.4231 | N | $ 20 | $ 2,269 | 0.01 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 04 | view details |
INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | 2.4221 | I | $ 700 | $ 418 | 1.67 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 05 | view details |
INSTALL AUTOMATIC STACK DAMPER | 2.1123 | I | $ 3,000 | $ 3,144 | 0.95 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 06 | view details |
ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | 2.1233 | I | $ 2,000 | $ 882 | 2.27 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 07 | view details |
USE WASTE HEAT FROM HOT FLUE GASES TO GENERATE STEAM | 2.2422 | N | $ 1,400 | $ 801 | 1.75 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 08 | view details |
REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | 2.6121 | I | $ 0 | $ 160 | 0.00 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 09 | view details |
IMPROVE LUBRICATION PRACTICES | 2.4312 | I | $ 4,500 | $ 6,002 | 0.75 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||