Industrial Assessment Centers
Assessment #IC0138
| Assessment Year | 2008 |
|---|---|
| SIC | 3633 |
| SIC Description | Household Laundry Equipment |
| NAICS | 334512 |
| NAICS Description | Automatic Environmental Control Manufacturing for Residential, Commercial, and Appliance Use |
| Principal Product | Appliance timers |
| Sales | $ 30,000,000 |
| # of Employees | 215 |
| Plant Area (Sq.Ft.) | 196,598 |
| Annual Production | 4,750,000 Pieces |
| Production Hrs. Annual | 4,135 |
| Location (State) | IN |
| Yearly Energy Cost | $ 631,258 |
Current Energy Usage & Costs
| Energy Sources | Yearly Usage | Yearly Cost | Unit Price |
|---|---|---|---|
Electricity |
9,372,300 kWh | $ 203,607 | $ 0.022 /kWh |
- Demand Charge |
25,496 kW | $ 338,685 | $ 13.28 /kW |
- Electricity Fees |
- | $ 0 | - |
Natural Gas |
9,886 MMBtu | $ 88,966 | $ 9.00 /MMBtu |
TOTAL ENERGY |
105,952 MMBtu | $ 631,258 | $ 5.96 /MMBtu |
Water Disposal |
5,157,600 Gal | $ 29,766 | $ 0 /Gal |
Recommended Reduction in Usage & Costs
|
Recommended Implemented |
| Energy Sources | Yearly Savings | Yearly Cost | % Saved | Unit Price |
|---|---|---|---|---|
Electricity |
639,430 kWh 639,430 kWh |
$ 14,070 $ 14,070 |
6.91 % 6.91 % |
$ 0.022 /kWh |
- Demand Charge |
1,324 kW 1,324 kW |
$ 17,586 $ 17,586 |
5.19 % 5.19 % |
$ 13.28 /kW |
- Electricity Fees |
- |
$ 0 $ 0 |
0.00 % 0.00 % |
- |
Natural Gas |
2,069 MMBtu 2,069 MMBtu |
$ 20,511 $ 20,511 |
23.05 % 23.05 % |
$ 9.00 /MMBtu |
TOTAL ENERGY |
8,624 MMBtu 8,624 MMBtu |
$ 52,167 $ 52,167 |
8.26 % 8.26 % |
$ 5.96 /MMBtu |
Water Disposal |
14,406 Gal 14,406 Gal |
$ 84 $ 84 |
0.28 % 0.28 % |
$ 0 /Gal |
Recommendations
| AR # | Description | ARC Code | Status | Cost | Savings | Payback (Years) |
|||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 01 | view details |
UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | 2.7142 | I | $ 66,929 | $ 32,199 | 2.08 | ||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||
| 02 | view details |
UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | 2.7142 | I | $ 537 | $ 422 | 1.27 | ||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||
| 03 | view details |
INSTALL OCCUPANCY SENSORS | 2.7135 | I | $ 3,982 | $ 927 | 4.30 | ||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||
| 04 | view details |
UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | 2.7142 | I | $ 143,228 | $ 18,232 | 7.86 | ||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||
| 05 | view details |
USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | 2.4133 | I | $ 20,784 | $ 4,556 | 4.56 | ||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||
| 06 | view details |
ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | 2.1233 | I | $ 0 | $ 2,154 | 0.00 | ||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||
| 07 | view details |
ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | 2.1233 | I | $ 0 | $ 3,513 | 0.00 | ||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||
| 08 | view details |
REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | 2.4231 | I | $ 0 | $ 158 | 0.00 | ||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||
| 09 | view details |
REPAIR OR REPLACE STEAM TRAPS | 2.2113 | I | $ 1,500 | $ 14,928 | 0.10 | ||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||
