| Assessment Year | 2004 |
|---|---|
| SIC | 3315 |
| SIC Description | Steel Wire And Related Products |
| NAICS | 331222 |
| NAICS Description | Steel Wire Drawing |
| Principal Product | Drawn Wire |
| Sales | $ 75,000,000 |
| # of Employees | 118 |
| Plant Area (Sq.Ft.) | 204,500 |
| Annual Production | 175,000 Tons |
| Production Hrs. Annual | 7,248 |
| Location (State) | IN |
| Yearly Energy Cost | $ 2,086,483 |
| Energy Sources | Yearly Usage | Yearly Cost | Unit Price |
|---|---|---|---|
Electricity |
27,900,000 kWh | $ 1,255,500 | $ 0.045 /kWh |
- Demand Charge |
60,348 kW | $ 407,176 | $ 6.75 /kW |
- Electricity Fees |
- | $ -183,017 | - |
Natural Gas |
98,353 MMBtu | $ 606,824 | $ 6.17 /MMBtu |
TOTAL ENERGY |
384,328 MMBtu | $ 2,086,483 | $ 5.43 /MMBtu |
|
Recommended Implemented |
| Energy Sources | Yearly Savings | Yearly Cost | % Saved | Unit Price |
|---|---|---|---|---|
Electricity |
2,485,307 kWh 2,286,532 kWh |
$ 93,983 $ 86,434 |
7.49 % 6.88 % |
$ 0.045 /kWh |
- Demand Charge |
4,123 kW 3,830 kW |
$ 25,784 $ 23,945 |
6.33 % 5.88 % |
$ 6.75 /kW |
- Electricity Fees |
- |
$ 0 $ 0 |
0.00 % 0.00 % |
- |
Natural Gas |
30,425 MMBtu 11,510 MMBtu |
$ 187,723 $ 71,017 |
30.94 % 11.70 % |
$ 6.17 /MMBtu |
TOTAL ENERGY |
55,899 MMBtu 34,947 MMBtu |
$ 307,490 $ 181,396 |
14.74 % 8.69 % |
$ 5.43 /MMBtu |
| AR # | Description | ARC Code | Status | Cost | Savings | Payback (Years) |
|||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 01 | view details |
INCREASE AMOUNT OF CONDENSATE RETURNED | 2.2121 | N | $ 13,907 | $ 144,862 | 0.10 | ||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||
| 02 | view details |
ELIMINATE LEAKS IN COMBUSTIBLE GAS LINES | 2.1134 | I | $ 0 | $ 105 | 0.00 | ||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||
| 03 | view details |
INSULATE STEAM / HOT WATER LINES | 2.2131 | I | $ 400 | $ 1,035 | 0.39 | ||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||
| 04 | view details |
REPAIR LEAKS IN LINES AND VALVES | 2.2133 | I | $ 585 | $ 4,809 | 0.12 | ||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||
| 05 | view details |
ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | 2.1233 | N | $ 4,021 | $ 18,612 | 0.22 | ||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||
| 06 | view details |
DIRECT WARMEST AIR TO COMBUSTION INTAKE | 2.1213 | I | $ 582,998 | $ 943 | 618.24 | ||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||
| 07 | view details |
ELIMINATE LEAKS IN WATER LINES AND VALVES | 3.4154 | N | $ 430,000 | $ 2,024 | 212.45 | ||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||
| 08 | view details |
USE WASTE HEAT FROM HOT FLUE GASES TO GENERATE STEAM | 2.2422 | I | $ 200 | $ 48,922 | 0.00 | ||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||
| 09 | view details |
USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | 2.4133 | I | $ 513 | $ 124,469 | 0.00 | ||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||
| 10 | view details |
USE MULTIPLE SPEED MOTORS OR AFD FOR VARIABLE PUMP, BLOWER AND COMPRESSOR LOADS | 2.4141 | I | $ 5,100 | $ 794 | 6.42 | ||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||
| 11 | view details |
INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | 2.4222 | I | $ 0 | $ 122 | 0.00 | ||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||
| 12 | view details |
ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS | 2.1231 | N | $ 1,854 | $ 156 | 11.88 | ||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||
| 13 | view details |
SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING | 2.4237 | I | $ 240 | $ 197 | 1.22 | ||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||
| 14 | view details |
REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | 2.7111 | N | $ 96,551 | $ 3,645 | 26.49 | ||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||
| 15 | view details |
UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | 2.7142 | N | $ 13,349 | $ 2,601 | 5.13 | ||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||
| 16 | view details |
UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | 2.7142 | N | $ 2,376 | $ 1,775 | 1.34 | ||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||
| 17 | view details |
INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | 2.7132 | N | $ 5,190 | $ 1,694 | 3.06 | ||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||