Industrial Assessment Centers
Assessment #IA0484
| Assessment Year | 2012 |
|---|---|
| SIC | 3081 |
| SIC Description | Unsupported Plastics Film & Sheet |
| NAICS | 326113 |
| NAICS Description | Unlaminated Plastics Film and Sheet (except Packaging) Manufacturing |
| Principal Product | Expandable Foam |
| Sales | $ 11,000,000 |
| # of Employees | 60 |
| Plant Area (Sq.Ft.) | 82,500 |
| Annual Production | 4,800,000 Pounds |
| Production Hrs. Annual | 6,120 |
| Location (State) | IA |
| Yearly Energy Cost | $ 509,784 |
Current Energy Usage & Costs
| Energy Sources | Yearly Usage | Yearly Cost | Unit Price |
|---|---|---|---|
Electricity |
2,876,000 kWh | $ 101,967 | $ 0.035 /kWh |
- Demand Charge |
6,268 kW | $ 92,576 | $ 14.77 /kW |
- Electricity Fees |
- | $ 6,775 | - |
Natural Gas |
58,142 MMBtu | $ 308,466 | $ 5.31 /MMBtu |
TOTAL ENERGY |
87,621 MMBtu | $ 509,784 | $ 5.82 /MMBtu |
Recommended Reduction in Usage & Costs
|
Recommended Implemented |
| Energy Sources | Yearly Savings | Yearly Cost | % Saved | Unit Price |
|---|---|---|---|---|
Electricity |
345,766 kWh 0 kWh |
$ 12,206 $ 0 |
11.97 % 0.00 % |
$ 0.035 /kWh |
- Demand Charge |
701 kW 0 kW |
$ 10,031 $ 0 |
10.84 % 0.00 % |
$ 14.77 /kW |
- Electricity Fees |
- |
$ 0 $ 0 |
0.00 % 0.00 % |
- |
Natural Gas |
610 MMBtu 0 MMBtu |
$ 3,239 $ 0 |
1.05 % 0.00 % |
$ 5.31 /MMBtu |
TOTAL ENERGY |
4,154 MMBtu 0 MMBtu |
$ 25,476 $ 0 |
5.00 % 0.00 % |
$ 5.82 /MMBtu |
Recommendations
| AR # | Description | ARC Code | Status | Cost | Savings | Payback (Years) |
|||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 01 | view details |
DIRECT WARMEST AIR TO COMBUSTION INTAKE | 2.1213 | $ 401 | $ 2,225 | 0.18 | |||||||||||||||||
|
|||||||||||||||||||||||
| 02 | view details |
REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | 2.7111 | $ 390 | $ 664 | 0.59 | |||||||||||||||||
|
|||||||||||||||||||||||
| 03 | view details |
INSTALL OCCUPANCY SENSORS | 2.7135 | $ 1,424 | $ 442 | 3.22 | |||||||||||||||||
|
|||||||||||||||||||||||
| 04 | view details |
UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | 2.7142 | $ 799 | $ 769 | 1.04 | |||||||||||||||||
|
|||||||||||||||||||||||
| 05 | view details |
UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | 2.7142 | $ 11,275 | $ 10,589 | 1.06 | |||||||||||||||||
|
|||||||||||||||||||||||
| 06 | view details |
INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | 2.4221 | $ 971 | $ 2,822 | 0.34 | |||||||||||||||||
|
|||||||||||||||||||||||
| 07 | view details |
RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR | 2.2531 | $ 1,466 | $ 1,014 | 1.45 | |||||||||||||||||
|
|||||||||||||||||||||||
| 08 | view details |
ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | 2.4236 | $ 250 | $ 1,427 | 0.18 | |||||||||||||||||
|
|||||||||||||||||||||||
| 09 | view details |
USE ADJUSTABLE FREQUENCY DRIVE TO REPLACE MECHANICAL DRIVE | 2.4144 | $ 7,700 | $ 4,537 | 1.70 | |||||||||||||||||
|
|||||||||||||||||||||||
| 10 | view details |
USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | 2.4133 | $ 1,009 | $ 987 | 1.02 | |||||||||||||||||
|
|||||||||||||||||||||||