Industrial Assessment Centers
Assessment #IA0453
| Assessment Year | 2010 |
|---|---|
| SIC | 3084 |
| SIC Description | Plastics Pipe |
| NAICS | 326122 |
| NAICS Description | Plastics Pipe and Pipe Fitting Manufacturing |
| Principal Product | Polyethylene plastic pipe |
| Sales | $ 25,000,000 |
| # of Employees | 100 |
| Plant Area (Sq.Ft.) | 63,000 |
| Annual Production | 19,000,000 Pounds |
| Production Hrs. Annual | 6,240 |
| Location (State) | NE |
| Yearly Energy Cost | $ 326,599 |
Current Energy Usage & Costs
| Energy Sources | Yearly Usage | Yearly Cost | Unit Price |
|---|---|---|---|
Electricity |
5,745,600 kWh | $ 225,686 | $ 0.039 /kWh |
- Demand Charge |
13,584 kW | $ 96,319 | $ 7.09 /kW |
- Electricity Fees |
- | $ 380 | - |
Natural Gas |
715 MMBtu | $ 4,214 | $ 5.89 /MMBtu |
TOTAL ENERGY |
59,608 MMBtu | $ 326,599 | $ 5.48 /MMBtu |
Recommended Reduction in Usage & Costs
|
Recommended Implemented |
| Energy Sources | Yearly Savings | Yearly Cost | % Saved | Unit Price |
|---|---|---|---|---|
Electricity |
531,770 kWh 373,714 kWh |
$ 20,897 $ 14,685 |
9.26 % 6.51 % |
$ 0.039 /kWh |
- Demand Charge |
152 kW 107 kW |
$ 1,073 $ 757 |
1.11 % 0.79 % |
$ 7.09 /kW |
- Electricity Fees |
- |
$ 0 $ 0 |
0.00 % 0.00 % |
- |
Natural Gas |
554 MMBtu 207 MMBtu |
$ 3,252 $ 1,215 |
77.17 % 28.83 % |
$ 5.89 /MMBtu |
TOTAL ENERGY |
6,005 MMBtu 4,038 MMBtu |
$ 25,222 $ 16,657 |
7.72 % 5.10 % |
$ 5.48 /MMBtu |
Recommendations
| AR # | Description | ARC Code | Status | Cost | Savings | Payback (Years) |
|||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 01 | view details |
UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | 2.7142 | I | $ 19,968 | $ 8,157 | 2.45 | ||||||||||||||||
|
|||||||||||||||||||||||
| 02 | view details |
INSTALL OCCUPANCY SENSORS | 2.7135 | I | $ 1,037 | $ 1,082 | 0.96 | ||||||||||||||||
|
|||||||||||||||||||||||
| 03 | view details |
USE ADJUSTABLE FREQUENCY DRIVE TO REPLACE MECHANICAL DRIVE | 2.4144 | N | $ 24,540 | $ 5,755 | 4.26 | ||||||||||||||||
|
|||||||||||||||||||||||
| 04 | view details |
USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | 2.4133 | I | $ 11,586 | $ 5,525 | 2.10 | ||||||||||||||||
|
|||||||||||||||||||||||
| 05 | view details |
REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | 2.4231 | N | $ 25 | $ 203 | 0.12 | ||||||||||||||||
|
|||||||||||||||||||||||
| 06 | view details |
RECOVER HEAT FROM AIR COMPRESSOR | 2.2434 | N | $ 1,500 | $ 2,037 | 0.74 | ||||||||||||||||
|
|||||||||||||||||||||||
| 07 | view details |
INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | 2.4221 | N | $ 530 | $ 570 | 0.93 | ||||||||||||||||
|
|||||||||||||||||||||||
| 08 | view details |
ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | 2.4236 | I | $ 81 | $ 678 | 0.12 | ||||||||||||||||
|
|||||||||||||||||||||||
| 09 | view details |
IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | 2.7243 | I | $ 3,400 | $ 1,215 | 2.80 | ||||||||||||||||
|
|||||||||||||||||||||||