Industrial Assessment Centers
Assessment #IA0447
| Assessment Year | 2010 |
|---|---|
| SIC | 3069 |
| SIC Description | Fabricated Rubber Products, Nec |
| NAICS | 336399 |
| NAICS Description | All Other Motor Vehicle Parts Manufacturing |
| Principal Product | Fasteners |
| Sales | $ 50,000,000 |
| # of Employees | 129 |
| Plant Area (Sq.Ft.) | 150,000 |
| Annual Production | 11,000,000 Pounds |
| Production Hrs. Annual | 8,760 |
| Location (State) | mn |
| Yearly Energy Cost | $ 622,041 |
Current Energy Usage & Costs
| Energy Sources | Yearly Usage | Yearly Cost | Unit Price |
|---|---|---|---|
Electricity |
6,908,725 kWh | $ 301,496 | $ 0.044 /kWh |
- Demand Charge |
13,908 kW | $ 180,804 | $ 13.00 /kW |
- Electricity Fees |
- | $ 0 | - |
Natural Gas |
21,020 MMBtu | $ 139,741 | $ 6.65 /MMBtu |
TOTAL ENERGY |
91,835 MMBtu | $ 622,041 | $ 6.77 /MMBtu |
Recommended Reduction in Usage & Costs
|
Recommended Implemented |
| Energy Sources | Yearly Savings | Yearly Cost | % Saved | Unit Price |
|---|---|---|---|---|
Electricity |
568,710 kWh 402,134 kWh |
$ 24,961 $ 17,649 |
8.28 % 5.85 % |
$ 0.044 /kWh |
- Demand Charge |
500 kW 482 kW |
$ 6,489 $ 6,255 |
3.59 % 3.46 % |
$ 13.00 /kW |
- Electricity Fees |
- |
$ 0 $ 0 |
0.00 % 0.00 % |
- |
Natural Gas |
4,499 MMBtu 4,499 MMBtu |
$ 29,089 $ 29,089 |
20.82 % 20.82 % |
$ 6.65 /MMBtu |
TOTAL ENERGY |
10,328 MMBtu 8,621 MMBtu |
$ 60,539 $ 52,993 |
9.73 % 8.52 % |
$ 6.77 /MMBtu |
Recommendations
| AR # | Description | ARC Code | Status | Cost | Savings | Payback (Years) |
|||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 01 | view details |
UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | 2.7142 | N | $ 487 | $ 745 | 0.65 | ||||||||||||||||
|
|||||||||||||||||||||||
| 02 | view details |
UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | 2.7142 | I | $ 13,439 | $ 17,514 | 0.77 | ||||||||||||||||
|
|||||||||||||||||||||||
| 03 | view details |
ELIMINATE PERMANENTLY THE USE OF COMPRESSED AIR | 2.4233 | I | $ 1,140 | $ 2,599 | 0.44 | ||||||||||||||||
|
|||||||||||||||||||||||
| 04 | view details |
REDUCE BUILDING VENTILATION AIR TO MINIMUM SAFE LEVELS | 2.7315 | I | $ 2,000 | $ 3,072 | 0.65 | ||||||||||||||||
|
|||||||||||||||||||||||
| 05 | view details |
USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER | 2.2692 | N | $ 42,100 | $ 6,801 | 6.19 | ||||||||||||||||
|
|||||||||||||||||||||||
| 06 | view details |
REPLACE BOILER | 2.1224 | I | $ 53,900 | $ 29,283 | 1.84 | ||||||||||||||||
|
|||||||||||||||||||||||
| 07 | view details |
SUBSTITUTE HOT PROCESS FLUIDS FOR STEAM | 2.2191 | I | $ 5,000 | $ 525 | 9.52 | ||||||||||||||||
|
|||||||||||||||||||||||