Industrial Assessment Centers
Assessment #IA0446
| Assessment Year | 2009 |
|---|---|
| SIC | 3089 |
| SIC Description | Plastics Products, Nec |
| NAICS | 326199 |
| NAICS Description | All Other Plastics Product Manufacturing |
| Principal Product | Composite pressure vessels |
| Sales | $ 1 |
| # of Employees | 135 |
| Plant Area (Sq.Ft.) | 201,000 |
| Annual Production | 13,000 Not Available |
| Production Hrs. Annual | 6,000 |
| Location (State) | NE |
| Yearly Energy Cost | $ 912,176 |
Current Energy Usage & Costs
| Energy Sources | Yearly Usage | Yearly Cost | Unit Price |
|---|---|---|---|
Electricity |
7,629,500 kWh | $ 171,045 | $ 0.022 /kWh |
- Demand Charge |
16,392 kW | $ 262,756 | $ 16.03 /kW |
- Electricity Fees |
- | $ 0 | - |
Natural Gas |
43,621 MMBtu | $ 478,375 | $ 10.97 /MMBtu |
TOTAL ENERGY |
121,823 MMBtu | $ 912,176 | $ 7.49 /MMBtu |
Recommended Reduction in Usage & Costs
|
Recommended Implemented |
| Energy Sources | Yearly Savings | Yearly Cost | % Saved | Unit Price |
|---|---|---|---|---|
Electricity |
2,235,511 kWh 1,767,009 kWh |
$ 48,730 $ 38,517 |
28.49 % 22.52 % |
$ 0.022 /kWh |
- Demand Charge |
3,623 kW 3,120 kW |
$ 64,549 $ 56,400 |
24.57 % 21.46 % |
$ 16.03 /kW |
- Electricity Fees |
- |
$ 0 $ 0 |
0.00 % 0.00 % |
- |
Natural Gas |
10,225 MMBtu 3,072 MMBtu |
$ 117,164 $ 39,011 |
24.49 % 8.15 % |
$ 10.97 /MMBtu |
TOTAL ENERGY |
33,141 MMBtu 21,185 MMBtu |
$ 230,443 $ 133,928 |
25.26 % 14.68 % |
$ 7.49 /MMBtu |
Recommendations
| AR # | Description | ARC Code | Status | Cost | Savings | Payback (Years) |
|||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 01 | view details |
UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | 2.7142 | I | $ 5,819 | $ 6,768 | 0.86 | ||||||||||||||||
|
|||||||||||||||||||||||
| 02 | view details |
UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | 2.7142 | I | $ 29,591 | $ 36,189 | 0.82 | ||||||||||||||||
|
|||||||||||||||||||||||
| 03 | view details |
UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | 2.7142 | I | $ 12,486 | $ 17,951 | 0.70 | ||||||||||||||||
|
|||||||||||||||||||||||
| 04 | view details |
UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | 2.7142 | I | $ 32,570 | $ 24,368 | 1.34 | ||||||||||||||||
|
|||||||||||||||||||||||
| 05 | view details |
INSTALL OCCUPANCY SENSORS | 2.7135 | I | $ 876 | $ 374 | 2.34 | ||||||||||||||||
|
|||||||||||||||||||||||
| 06 | view details |
ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | 2.4236 | I | $ 268 | $ 4,146 | 0.06 | ||||||||||||||||
|
|||||||||||||||||||||||
| 07 | view details |
COVER OPEN TANKS | 2.2514 | N | $ 20,000 | $ 26,317 | 0.76 | ||||||||||||||||
|
|||||||||||||||||||||||
| 08 | view details |
USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | 2.4323 | N | $ 15,000 | $ 23,136 | 0.65 | ||||||||||||||||
|
|||||||||||||||||||||||
| 09 | view details |
INSULATE BARE EQUIPMENT | 2.2511 | N | $ 3,180 | $ 4,474 | 0.71 | ||||||||||||||||
|
|||||||||||||||||||||||
| 10 | view details |
ELIMINATE OR REDUCE COMPRESSED AIR USED FOR COOLING, AGITATING LIQUIDS, MOVING PRODUCT, OR DRYING | 2.4232 | I | $ 740 | $ 4,136 | 0.18 | ||||||||||||||||
|
|||||||||||||||||||||||
| 11 | view details |
ELIMINATE OR REDUCE COMPRESSED AIR USED FOR COOLING, AGITATING LIQUIDS, MOVING PRODUCT, OR DRYING | 2.4232 | N | $ 1,860 | $ 10,917 | 0.17 | ||||||||||||||||
|
|||||||||||||||||||||||
| 12 | view details |
REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | 2.4231 | N | $ 15 | $ 5,241 | 0.00 | ||||||||||||||||
|
|||||||||||||||||||||||
| 13 | view details |
RECOVER WASTE HEAT FROM EQUIPMENT | 2.2437 | N | $ 1,860 | $ 21,403 | 0.09 | ||||||||||||||||
|
|||||||||||||||||||||||
| 14 | view details |
USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | 2.1243 | N | $ 1,000 | $ 505 | 1.98 | ||||||||||||||||
|
|||||||||||||||||||||||
| 15 | view details |
DIRECT WARMEST AIR TO COMBUSTION INTAKE | 2.1213 | N | $ 213 | $ 333 | 0.64 | ||||||||||||||||
|
|||||||||||||||||||||||
| 16 | view details |
USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | 2.6221 | I | $ 40,000 | $ 16,258 | 2.46 | ||||||||||||||||
|
|||||||||||||||||||||||
| 17 | view details |
INSULATE STEAM / HOT WATER LINES | 2.2131 | N | $ 1,461 | $ 1,399 | 1.04 | ||||||||||||||||
|
|||||||||||||||||||||||
| 18 | view details |
TURN OFF STEAM TRACING DURING MILD WEATHER | 2.2164 | I | $ 260 | $ 957 | 0.27 | ||||||||||||||||
|
|||||||||||||||||||||||
| 19 | view details |
AIR CONDITION ONLY SPACE IN USE | 2.7222 | N | $ 3,725 | $ 1,847 | 2.02 | ||||||||||||||||
|
|||||||||||||||||||||||
| 20 | view details |
IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | 2.7243 | N | $ 2,600 | $ 943 | 2.76 | ||||||||||||||||
|
|||||||||||||||||||||||
| 21 | view details |
ELIMINATE LEAKS IN WATER LINES AND VALVES | 3.4154 | I | $ 115 | $ 2,298 | 0.05 | ||||||||||||||||
|
|||||||||||||||||||||||
| 22 | view details |
UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | 2.6231 | I | $ 15,000 | $ 19,469 | 0.77 | ||||||||||||||||
|
|||||||||||||||||||||||
| 23 | view details |
REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | 2.7224 | I | $ 2,060 | $ 3,312 | 0.62 | ||||||||||||||||
|
|||||||||||||||||||||||