Industrial Assessment Centers
Assessment #IA0433
| Assessment Year | 2008 |
|---|---|
| SIC | 3714 |
| SIC Description | Motor Vehicle Parts And Accessories |
| NAICS | 336399 |
| NAICS Description | All Other Motor Vehicle Parts Manufacturing |
| Principal Product | Fan Clutch for Class 8 Trucks |
| Sales | $ 95,000,000 |
| # of Employees | 160 |
| Plant Area (Sq.Ft.) | 120,000 |
| Annual Production | 250,000 Pieces |
| Production Hrs. Annual | 5,980 |
| Location (State) | SD |
| Yearly Energy Cost | $ 356,649 |
Current Energy Usage & Costs
| Energy Sources | Yearly Usage | Yearly Cost | Unit Price |
|---|---|---|---|
Electricity |
4,968,000 kWh | $ 197,738 | $ 0.040 /kWh |
- Demand Charge |
1,071 kW | $ 5,354 | $ 5.00 /kW |
- Electricity Fees |
- | $ 10,903 | - |
LPG |
5,811 MMBtu | $ 142,654 | $ 24.55 /MMBtu |
TOTAL ENERGY |
56,733 MMBtu | $ 356,649 | $ 6.29 /MMBtu |
Recommended Reduction in Usage & Costs
|
Recommended Implemented |
| Energy Sources | Yearly Savings | Yearly Cost | % Saved | Unit Price |
|---|---|---|---|---|
Electricity |
659,829 kWh 238,817 kWh |
$ 26,259 $ 9,503 |
13.28 % 4.81 % |
$ 0.040 /kWh |
- Demand Charge |
1,129 kW 311 kW |
$ 5,656 $ 1,564 |
105.64 % 29.21 % |
$ 5.00 /kW |
- Electricity Fees |
- |
$ 0 $ 0 |
0.00 % 0.00 % |
- |
LPG |
6,851 MMBtu 144 MMBtu |
$ 76,445 $ 3,380 |
53.59 % 2.37 % |
$ 24.55 /MMBtu |
TOTAL ENERGY |
13,638 MMBtu 2,616 MMBtu |
$ 108,947 $ 15,034 |
30.55 % 4.22 % |
$ 6.29 /MMBtu |
Recommendations
| AR # | Description | ARC Code | Status | Cost | Savings | Payback (Years) |
|||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 01 | view details |
REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | 2.1321 | N | $ 0 | $ 52,036 | 0.00 | ||||||||||||||||
|
|||||||||||||||||||||||
| 02 | view details |
ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | 2.4236 | I | $ 459 | $ 4,622 | 0.10 | ||||||||||||||||
|
|||||||||||||||||||||||
| 03 | view details |
INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | 2.4221 | I | $ 832 | $ 1,886 | 0.44 | ||||||||||||||||
|
|||||||||||||||||||||||
| 04 | view details |
REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | 2.4231 | I | $ 54 | $ 1,195 | 0.05 | ||||||||||||||||
|
|||||||||||||||||||||||
| 05 | view details |
RECOVER HEAT FROM AIR COMPRESSOR | 2.2434 | N | $ 1,700 | $ 13,871 | 0.12 | ||||||||||||||||
|
|||||||||||||||||||||||
| 06 | view details |
UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | 2.7142 | N | $ 37,346 | $ 20,324 | 1.84 | ||||||||||||||||
|
|||||||||||||||||||||||
| 07 | view details |
INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | 2.7241 | I | $ 4,000 | $ 3,364 | 1.19 | ||||||||||||||||
|
|||||||||||||||||||||||
| 08 | view details |
REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | 2.7224 | I | $ 142 | $ 587 | 0.24 | ||||||||||||||||
|
|||||||||||||||||||||||
| 09 | view details |
INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | 2.7491 | N | $ 4,624 | $ 7,158 | 0.65 | ||||||||||||||||
|
|||||||||||||||||||||||
| 10 | view details |
INSULATE BARE EQUIPMENT | 2.2511 | N | $ 254 | $ 524 | 0.48 | ||||||||||||||||
|
|||||||||||||||||||||||
| 11 | view details |
ADJUST VENTS TO MINIMIZE ENERGY USE | 2.6122 | I | $ 294 | $ 3,380 | 0.09 | ||||||||||||||||
|
|||||||||||||||||||||||