Industrial Assessment Centers
Assessment #IA0252
| Assessment Year | 2000 |
|---|---|
| SIC | 2026 |
| SIC Description | Fluid Milk |
| NAICS | |
| NAICS Description | |
| Principal Product | dairy products |
| Sales | $ 90,000,000 |
| # of Employees | 200 |
| Plant Area (Sq.Ft.) | 80,000 |
| Annual Production | 250,000,000 Pounds |
| Production Hrs. Annual | 7,488 |
| Location (State) | NE |
| Yearly Energy Cost | $ 448,351 |
Current Energy Usage & Costs
| Energy Sources | Yearly Usage | Yearly Cost | Unit Price |
|---|---|---|---|
Electricity |
9,396,249 kWh | $ 222,863 | $ 0.024 /kWh |
- Demand Charge |
18,444 kW | $ 129,830 | $ 7.04 /kW |
- Electricity Fees |
- | $ 0 | - |
Natural Gas |
34,205 MMBtu | $ 95,658 | $ 2.80 /MMBtu |
TOTAL ENERGY |
130,517 MMBtu | $ 448,351 | $ 3.44 /MMBtu |
Water Disposal |
52,938,360 Gal | $ 0 | $ 0 /Gal |
Recommended Reduction in Usage & Costs
|
Recommended Implemented |
| Energy Sources | Yearly Savings | Yearly Cost | % Saved | Unit Price |
|---|---|---|---|---|
Electricity |
354,337 kWh 266,705 kWh |
$ 7,829 $ 6,247 |
3.51 % 2.80 % |
$ 0.024 /kWh |
- Demand Charge |
628 kW 517 kW |
$ 4,030 $ 3,644 |
3.10 % 2.81 % |
$ 7.04 /kW |
- Electricity Fees |
- |
$ 0 $ 0 |
0.00 % 0.00 % |
- |
Natural Gas |
1 MMBtu 0 MMBtu |
$ 617 $ 0 |
0.65 % 0.00 % |
$ 2.80 /MMBtu |
TOTAL ENERGY |
3,633 MMBtu 2,734 MMBtu |
$ 12,476 $ 9,891 |
2.78 % 2.21 % |
$ 3.44 /MMBtu |
Water Disposal |
0 Gal 0 Gal |
$ 0 $ 0 |
0.00 % 0.00 % |
$ 0 /Gal |
Recommendations
| AR # | Description | ARC Code | Status | Cost | Savings | Payback (Years) |
|||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 01 | view details |
INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | 2.4221 | N | $ 2,487 | $ 2,486 | 1.00 | ||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||
| 02 | view details |
REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | 2.4231 | I | $ 1,921 | $ 1,923 | 1.00 | ||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||
| 03 | view details |
ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | 2.4236 | I | $ 1,421 | $ 1,422 | 1.00 | ||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||
| 04 | view details |
UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | 2.4111 | I | $ 2,855 | $ 2,856 | 1.00 | ||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||
| 05 | view details |
USE MULTIPLE SPEED MOTORS OR AFD FOR VARIABLE PUMP, BLOWER AND COMPRESSOR LOADS | 2.4141 | I | $ 2,132 | $ 2,132 | 1.00 | ||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||
| 06 | view details |
USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | 2.4133 | I | $ 775 | $ 909 | 0.85 | ||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||
| 07 | view details |
INSTALL OCCUPANCY SENSORS | 2.7135 | N | $ 488 | $ 488 | 1.00 | ||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||
| 08 | view details |
UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | 2.7142 | I | $ 374 | $ 649 | 0.58 | ||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||
| 09 | view details |
DIRECT WARMEST AIR TO COMBUSTION INTAKE | 2.1213 | N | $ 617 | $ 617 | 1.00 | ||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||
| 10 | view details |
INSTALL AUTOMATIC PACKING EQUIPMENT | 4.4410 | N | $ 88,849 | $ 88,850 | 1.00 | ||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||
| 11 | view details |
DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS | 4.1220 | N | $ 2,101 | $ 2,101 | 1.00 | ||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||