Industrial Assessment Centers
Assessment #HO0195
| Assessment Year | 1999 |
|---|---|
| SIC | 3433 |
| SIC Description | Heating Equipment, Except Electric |
| NAICS | |
| NAICS Description | |
| Principal Product | Boilers & Tanks |
| Sales | $ 22,000,000 |
| # of Employees | 275 |
| Plant Area (Sq.Ft.) | 27,000 |
| Annual Production | 550 Pieces |
| Production Hrs. Annual | 4,130 |
| Location (State) | NY |
| Yearly Energy Cost | $ 76,747 |
Current Energy Usage & Costs
| Energy Sources | Yearly Usage | Yearly Cost | Unit Price |
|---|---|---|---|
Electricity |
530,774 kWh | $ 28,391 | $ 0.053 /kWh |
- Demand Charge |
2,031 kW | $ 43,079 | $ 21.21 /kW |
- Electricity Fees |
- | $ 0 | - |
Natural Gas |
565 MMBtu | $ 5,277 | $ 9.34 /MMBtu |
TOTAL ENERGY |
6,005 MMBtu | $ 76,747 | $ 12.78 /MMBtu |
Recommended Reduction in Usage & Costs
|
Recommended Implemented |
| Energy Sources | Yearly Savings | Yearly Cost | % Saved | Unit Price |
|---|---|---|---|---|
Electricity |
85,580 kWh 0 kWh |
$ 4,571 $ 0 |
16.10 % 0.00 % |
$ 0.053 /kWh |
- Demand Charge |
252 kW 0 kW |
$ 5,359 $ 0 |
12.44 % 0.00 % |
$ 21.21 /kW |
- Electricity Fees |
- |
$ 0 $ 0 |
0.00 % 0.00 % |
- |
Natural Gas |
312 MMBtu 0 MMBtu |
$ 2,914 $ 0 |
55.22 % 0.00 % |
$ 9.34 /MMBtu |
TOTAL ENERGY |
1,190 MMBtu 0 MMBtu |
$ 12,844 $ 0 |
16.74 % 0.00 % |
$ 12.78 /MMBtu |
Recommendations
| AR # | Description | ARC Code | Status | Cost | Savings | Payback (Years) |
|||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 01 | view details |
UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | 2.7142 | N | $ 9,033 | $ 4,672 | 1.93 | ||||||||||||||||
|
|||||||||||||||||||||||
| 02 | view details |
REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | 2.7111 | N | $ 150 | $ 5,258 | 0.03 | ||||||||||||||||
|
|||||||||||||||||||||||
| 03 | view details |
AIR CONDITION ONLY SPACE IN USE | 2.7222 | N | $ 0 | $ 2,914 | 0.00 | ||||||||||||||||
|
|||||||||||||||||||||||
| 04 | view details |
IMPROVE SPACE COMFORT CONDITIONING | 4.4240 | N | $ 3,000 | $ 960 | 3.13 | ||||||||||||||||
|
|||||||||||||||||||||||
| 05 | view details |
ELIMINATE/REDUCE REDUNDANT INSPECTIONS | 4.4250 | I | $ 5,000 | $ 2,496 | 2.00 | ||||||||||||||||
|
|||||||||||||||||||||||
| 06 | view details |
RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS | 4.5140 | N | $ 340 | $ 6,240 | 0.05 | ||||||||||||||||
|
|||||||||||||||||||||||
| 07 | view details |
USE FIXTURES TO REDUCE MACHINE CHANGEOUT TIMES | 4.6210 | N | $ 5,000 | $ 6,192 | 0.81 | ||||||||||||||||
|
|||||||||||||||||||||||
| 08 | view details |
ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | 4.1110 | N | $ 2,500 | $ 1,248 | 2.00 | ||||||||||||||||
|
|||||||||||||||||||||||