Industrial Assessment Centers
Assessment #GT0894
| Assessment Year | 2012 |
|---|---|
| SIC | 2869 |
| SIC Description | Industrial Organic Chemicals, Nec |
| NAICS | 325199 |
| NAICS Description | All Other Basic Organic Chemical Manufacturing |
| Principal Product | Trienol |
| Sales | $ 15,000,000 |
| # of Employees | 80 |
| Plant Area (Sq.Ft.) | 200,000 |
| Annual Production | 15,000 Pounds |
| Production Hrs. Annual | 8,760 |
| Location (State) | GA |
| Yearly Energy Cost | $ 481,725 |
Current Energy Usage & Costs
| Energy Sources | Yearly Usage | Yearly Cost | Unit Price |
|---|---|---|---|
Electricity |
4,566,135 kWh | $ 195,448 | $ 0.043 /kWh |
- Demand Charge |
8,291 kW | $ 83,314 | $ 10.05 /kW |
- Electricity Fees |
- | $ 20,316 | - |
Natural Gas |
29,795 MMBtu | $ 182,647 | $ 6.13 /MMBtu |
TOTAL ENERGY |
76,598 MMBtu | $ 481,725 | $ 6.29 /MMBtu |
Recommended Reduction in Usage & Costs
|
Recommended Implemented |
| Energy Sources | Yearly Savings | Yearly Cost | % Saved | Unit Price |
|---|---|---|---|---|
Electricity |
974,434 kWh 0 kWh |
$ 54,662 $ 0 |
27.97 % 0.00 % |
$ 0.043 /kWh |
- Demand Charge |
2,083 kW 0 kW |
$ 24,354 $ 0 |
29.23 % 0.00 % |
$ 10.05 /kW |
- Electricity Fees |
- |
$ 0 $ 0 |
0.00 % 0.00 % |
- |
Natural Gas |
7,326 MMBtu 0 MMBtu |
$ 44,985 $ 0 |
24.63 % 0.00 % |
$ 6.13 /MMBtu |
TOTAL ENERGY |
17,314 MMBtu 0 MMBtu |
$ 124,001 $ 0 |
25.74 % 0.00 % |
$ 6.29 /MMBtu |
Recommendations
| AR # | Description | ARC Code | Status | Cost | Savings | Payback (Years) |
|||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 01 | view details |
ADJUST BURNERS FOR EFFICIENT OPERATION | 2.1133 | $ 0 | $ 5,045 | 0.00 | |||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 02 | view details |
USE PHOTOCELL CONTROLS | 2.7134 | $ 270 | $ 235 | 1.15 | |||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 03 | view details |
INSULATE BARE EQUIPMENT | 2.2511 | $ 1,300 | $ 656 | 1.98 | |||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 04 | view details |
INCREASE AMOUNT OF CONDENSATE RETURNED | 2.2121 | $ 7,500 | $ 5,680 | 1.32 | |||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 05 | view details |
USE MULTIPLE SPEED MOTORS OR AFD FOR VARIABLE PUMP, BLOWER AND COMPRESSOR LOADS | 2.4141 | $ 3,466 | $ 8,887 | 0.39 | |||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 06 | view details |
INSULATE STEAM / HOT WATER LINES | 2.2131 | $ 11,820 | $ 11,820 | 1.00 | |||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 07 | view details |
RECOVER WASTE HEAT FROM EQUIPMENT | 2.2437 | $ 78,000 | $ 20,940 | 3.72 | |||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 08 | view details |
REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | 2.2622 | $ 150,000 | $ 65,080 | 2.30 | |||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 09 | view details |
UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | 2.7142 | $ 32,620 | $ 4,158 | 7.85 | |||||||||||||||||||||
|
|||||||||||||||||||||||||||