Industrial Assessment Centers
Assessment #GT0882
| Assessment Year | 2011 |
|---|---|
| SIC | 3429 |
| SIC Description | Hardware, Nec |
| NAICS | 336399 |
| NAICS Description | All Other Motor Vehicle Parts Manufacturing |
| Principal Product | Automotive Locking Mechanism |
| Sales | $ 62,900,000 |
| # of Employees | 440 |
| Plant Area (Sq.Ft.) | 325,000 |
| Annual Production | 11,900,000 Pieces |
| Production Hrs. Annual | 5,880 |
| Location (State) | GA |
| Yearly Energy Cost | $ 1,435,537 |
Current Energy Usage & Costs
| Energy Sources | Yearly Usage | Yearly Cost | Unit Price |
|---|---|---|---|
Electricity |
13,514,048 kWh | $ 447,590 | $ 0.033 /kWh |
- Demand Charge |
46,402 kW | $ 627,820 | $ 13.53 /kW |
- Electricity Fees |
- | $ 36,140 | - |
Natural Gas |
40,816 MMBtu | $ 323,987 | $ 7.94 /MMBtu |
TOTAL ENERGY |
179,336 MMBtu | $ 1,435,537 | $ 8.00 /MMBtu |
Recommended Reduction in Usage & Costs
|
Recommended Implemented |
| Energy Sources | Yearly Savings | Yearly Cost | % Saved | Unit Price |
|---|---|---|---|---|
Electricity |
3,838,629 kWh 3,401,353 kWh |
$ 127,058 $ 112,585 |
28.39 % 25.15 % |
$ 0.033 /kWh |
- Demand Charge |
3,132 kW 1,392 kW |
$ 42,376 $ 18,834 |
6.75 % 3.00 % |
$ 13.53 /kW |
- Electricity Fees |
- |
$ 0 $ 0 |
0.00 % 0.00 % |
- |
Natural Gas |
10,414 MMBtu 0 MMBtu |
$ 82,687 $ 0 |
25.52 % 0.00 % |
$ 7.94 /MMBtu |
TOTAL ENERGY |
49,760 MMBtu 34,864 MMBtu |
$ 252,121 $ 131,419 |
17.56 % 9.15 % |
$ 8.00 /MMBtu |
Recommendations
| AR # | Description | ARC Code | Status | Cost | Savings | Payback (Years) |
|||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 01 | view details |
ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | 2.4236 | I | $ 0 | $ 13,634 | 0.00 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 02 | view details |
UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | 2.6231 | N | $ 0 | $ 7,201 | 0.00 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 03 | view details |
UTILIZE A LESS EXPENSIVE COOLING METHOD | 2.2628 | N | $ 70,000 | $ 28,143 | 2.49 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 04 | view details |
METER WASTE WATER | 3.4155 | N | $ 6,000 | $ 3,614 | 1.66 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 05 | view details |
UPGRADE CONTROLS ON COMPRESSORS | 2.4224 | I | $ 55,000 | $ 16,076 | 3.42 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 06 | view details |
REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | 2.7224 | I | $ 136,000 | $ 31,792 | 4.28 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 07 | view details |
USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | 2.4322 | I | $ 38,640 | $ 17,800 | 2.17 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 08 | view details |
USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR | 2.2492 | N | $ 222,000 | $ 85,358 | 2.60 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 09 | view details |
UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | 2.7142 | I | $ 155,150 | $ 47,117 | 3.29 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||