Industrial Assessment Centers
Assessment #GT0862
| Assessment Year | 2009 |
|---|---|
| SIC | 3713 |
| SIC Description | Truck And Bus Bodies |
| NAICS | 336211 |
| NAICS Description | Motor Vehicle Body Manufacturing |
| Principal Product | Highway Coaches |
| Sales | $ 35,000,000 |
| # of Employees | 200 |
| Plant Area (Sq.Ft.) | 212,000 |
| Annual Production | 60 Pieces |
| Production Hrs. Annual | 3,250 |
| Location (State) | GA |
| Yearly Energy Cost | $ 223,978 |
Current Energy Usage & Costs
| Energy Sources | Yearly Usage | Yearly Cost | Unit Price |
|---|---|---|---|
Electricity |
2,131,280 kWh | $ 79,923 | $ 0.038 /kWh |
- Demand Charge |
8,259 kW | $ 129,130 | $ 15.64 /kW |
- Electricity Fees |
- | $ 0 | - |
Natural Gas |
1,054 MMBtu | $ 14,925 | $ 14.16 /MMBtu |
TOTAL ENERGY |
22,900 MMBtu | $ 223,978 | $ 9.78 /MMBtu |
Recommended Reduction in Usage & Costs
|
Recommended Implemented |
| Energy Sources | Yearly Savings | Yearly Cost | % Saved | Unit Price |
|---|---|---|---|---|
Electricity |
93,334 kWh 0 kWh |
$ 10,086 $ 0 |
12.62 % 0.00 % |
$ 0.038 /kWh |
- Demand Charge |
113,430 kW 0 kW |
$ 8,430 $ 0 |
6.53 % 0.00 % |
$ 15.64 /kW |
- Electricity Fees |
- |
$ 0 $ 0 |
0.00 % 0.00 % |
- |
Natural Gas |
0 MMBtu 0 MMBtu |
$ 0 $ 0 |
0.00 % 0.00 % |
$ 14.16 /MMBtu |
TOTAL ENERGY |
956 MMBtu 0 MMBtu |
$ 18,516 $ 0 |
8.27 % 0.00 % |
$ 9.78 /MMBtu |
Recommendations
| AR # | Description | ARC Code | Status | Cost | Savings | Payback (Years) |
|||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 01 | view details |
UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | 2.7142 | N | $ 17,464 | $ 10,845 | 1.61 | ||||||||||||||||
|
|||||||||||||||||||||||
| 02 | view details |
ELIMINATE PERMANENTLY THE USE OF COMPRESSED AIR | 2.4233 | N | $ 0 | $ 962 | 0.00 | ||||||||||||||||
|
|||||||||||||||||||||||
| 03 | view details |
REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | 2.4231 | N | $ 0 | $ 439 | 0.00 | ||||||||||||||||
|
|||||||||||||||||||||||
| 04 | view details |
ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | 2.4236 | N | $ 500 | $ 810 | 0.62 | ||||||||||||||||
|
|||||||||||||||||||||||
| 05 | view details |
UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | 2.4111 | N | $ 449 | $ 325 | 1.38 | ||||||||||||||||
|
|||||||||||||||||||||||
| 06 | view details |
UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | 2.7142 | N | $ 9,840 | $ 3,517 | 2.80 | ||||||||||||||||
|
|||||||||||||||||||||||
| 07 | view details |
USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | 2.4133 | N | $ 11,925 | $ 1,618 | 7.37 | ||||||||||||||||
|
|||||||||||||||||||||||