Industrial Assessment Centers
Assessment #DL0081
| Assessment Year | 2012 |
|---|---|
| SIC | 2015 |
| SIC Description | Poultry Slaughtering And Processing |
| NAICS | 311615 |
| NAICS Description | Poultry Processing |
| Principal Product | Poultry Products |
| Sales | $ 999,999 |
| # of Employees | 1,200 |
| Plant Area (Sq.Ft.) | 162,962 |
| Annual Production | 54,600,000 Pieces |
| Production Hrs. Annual | 4,160 |
| Location (State) | DE |
| Yearly Energy Cost | $ 3,992,713 |
Current Energy Usage & Costs
| Energy Sources | Yearly Usage | Yearly Cost | Unit Price |
|---|---|---|---|
Electricity |
27,897,000 kWh | $ 2,575,902 | $ 0.092 /kWh |
- Demand Charge |
59,196 kW | $ 596,544 | $ 10.08 /kW |
- Electricity Fees |
- | $ 0 | - |
Natural Gas |
99,616 MMBtu | $ 711,488 | $ 7.14 /MMBtu |
LPG |
4,745 MMBtu | $ 108,779 | $ 22.92 /MMBtu |
TOTAL ENERGY |
390,308 MMBtu | $ 3,992,713 | $ 10.23 /MMBtu |
Recommended Reduction in Usage & Costs
|
Recommended Implemented |
| Energy Sources | Yearly Savings | Yearly Cost | % Saved | Unit Price |
|---|---|---|---|---|
Electricity |
4,839,124 kWh 1,340,734 kWh |
$ 551,660 $ 152,843 |
21.42 % 5.93 % |
$ 0.092 /kWh |
- Demand Charge |
0 kW 0 kW |
$ 0 $ 0 |
0.00 % 0.00 % |
$ 10.08 /kW |
- Electricity Fees |
- |
$ 0 $ 0 |
0.00 % 0.00 % |
- |
Natural Gas |
4,632 MMBtu 0 MMBtu |
$ 33,072 $ 0 |
4.65 % 0.00 % |
$ 7.14 /MMBtu |
LPG |
0 MMBtu 0 MMBtu |
$ 0 $ 0 |
0.00 % 0.00 % |
$ 22.92 /MMBtu |
TOTAL ENERGY |
54,234 MMBtu 13,743 MMBtu |
$ 584,732 $ 152,843 |
14.64 % 3.83 % |
$ 10.23 /MMBtu |
Recommendations
| AR # | Description | ARC Code | Status | Cost | Savings | Payback (Years) |
|||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 01 | view details |
UPGRADE CONTROLS ON COMPRESSORS | 2.4224 | N | $ 500,000 | $ 323,076 | 1.55 | ||||||||||||
|
|||||||||||||||||||
| 02 | view details |
USE MULTIPLE SPEED MOTORS OR AFD FOR VARIABLE PUMP, BLOWER AND COMPRESSOR LOADS | 2.4141 | I | $ 24,400 | $ 51,870 | 0.47 | ||||||||||||
|
|||||||||||||||||||
| 03 | view details |
USE MULTIPLE SPEED MOTORS OR AFD FOR VARIABLE PUMP, BLOWER AND COMPRESSOR LOADS | 2.4141 | I | $ 36,000 | $ 33,801 | 1.07 | ||||||||||||
|
|||||||||||||||||||
| 04 | view details |
USE MULTIPLE SPEED MOTORS OR AFD FOR VARIABLE PUMP, BLOWER AND COMPRESSOR LOADS | 2.4141 | I | $ 54,000 | $ 40,818 | 1.32 | ||||||||||||
|
|||||||||||||||||||
| 05 | view details |
INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | 2.4222 | N | $ 42,000 | $ 18,222 | 2.30 | ||||||||||||
|
|||||||||||||||||||
| 06 | view details |
UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | 2.6231 | N | $ 4,500 | $ 24,850 | 0.18 | ||||||||||||
|
|||||||||||||||||||
| 07 | view details |
UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | 2.6231 | N | $ 28,000 | $ 28,257 | 0.99 | ||||||||||||
|
|||||||||||||||||||
| 08 | view details |
IMPROVE COMBUSTION CONTROL CAPABILITY | 2.1116 | N | $ 8,900 | $ 16,536 | 0.54 | ||||||||||||
|
|||||||||||||||||||
| 09 | view details |
USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | 2.1243 | N | $ 25,000 | $ 16,536 | 1.51 | ||||||||||||
|
|||||||||||||||||||
| 10 | view details |
REDUCE VENTILATION AIR | 2.7314 | I | $ 4,500 | $ 26,354 | 0.17 | ||||||||||||
|
|||||||||||||||||||
| 11 | view details |
UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | 2.4111 | N | $ 720 | $ 4,412 | 0.16 | ||||||||||||
|
|||||||||||||||||||