Industrial Assessment Centers
Assessment #DL0070
| Assessment Year | 2011 |
|---|---|
| SIC | 2676 |
| SIC Description | Sanitary Paper Products |
| NAICS | 322291 |
| NAICS Description | Sanitary Paper Product Manufacturing |
| Principal Product | Baby Wipes |
| Sales | $ 250,000,000 |
| # of Employees | 470 |
| Plant Area (Sq.Ft.) | 450,000 |
| Annual Production | 16,200,000 Pieces |
| Production Hrs. Annual | 8,736 |
| Location (State) | DE |
| Yearly Energy Cost | $ 1,948,854 |
Current Energy Usage & Costs
| Energy Sources | Yearly Usage | Yearly Cost | Unit Price |
|---|---|---|---|
Electricity |
15,750,000 kWh | $ 1,712,944 | $ 0.109 /kWh |
- Electricity Fees |
- | $ 0 | - |
Natural Gas |
1,051 MMBtu | $ 14,714 | $ 14.00 /MMBtu |
Other Energy |
16,746 MMBtu | $ 221,196 | $ 13.21 /MMBtu |
TOTAL ENERGY |
179,236 MMBtu | $ 1,948,854 | $ 10.87 /MMBtu |
Water Disposal |
10,998,000 Gal | $ 48,876 | $ 0 /Gal |
Recommended Reduction in Usage & Costs
|
Recommended Implemented |
| Energy Sources | Yearly Savings | Yearly Cost | % Saved | Unit Price |
|---|---|---|---|---|
Electricity |
2,854,938 kWh 2,536,978 kWh |
$ 313,125 $ 278,470 |
18.28 % 16.26 % |
$ 0.109 /kWh |
- Electricity Fees |
- |
$ 0 $ 0 |
0.00 % 0.00 % |
- |
Natural Gas |
0 MMBtu 0 MMBtu |
$ 0 $ 0 |
0.00 % 0.00 % |
$ 14.00 /MMBtu |
Other Energy |
1,660 MMBtu 790 MMBtu |
$ 21,919 $ 10,400 |
9.91 % 4.70 % |
$ 13.21 /MMBtu |
TOTAL ENERGY |
30,923 MMBtu 26,794 MMBtu |
$ 335,043 $ 288,870 |
17.19 % 14.82 % |
$ 10.87 /MMBtu |
Water Disposal |
0 Gal 0 Gal |
$ 0 $ 0 |
0.00 % 0.00 % |
$ 0 /Gal |
Recommendations
| AR # | Description | ARC Code | Status | Cost | Savings | Payback (Years) |
|||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 01 | view details |
USE / PURCHASE OPTIMUM SIZED COMPRESSOR | 2.4226 | I | $ 120,000 | $ 136,635 | 0.88 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 02 | view details |
REDUCE VENTILATION AIR | 2.7314 | I | $ 200 | $ 12,200 | 0.02 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 03 | view details |
REDUCE VENTILATION AIR | 2.7314 | N | $ 45 | $ 2,160 | 0.02 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 04 | view details |
MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION | 2.6242 | I | $ 500 | $ 14,330 | 0.03 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 05 | view details |
UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | 2.4111 | N | $ 1,800 | $ 1,782 | 1.01 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 06 | view details |
REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | 2.2622 | I | $ 157,000 | $ 104,177 | 1.51 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 07 | view details |
USE STEAM SPARGING OR INJECTIONS IN PLACE OF INDIRECT HEATING | 2.1393 | N | $ 10,000 | $ 4,600 | 2.17 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 08 | view details |
MODERATE COOLING TOWER OUTLET TEMPERATURE | 2.2611 | I | $ 52,000 | $ 21,528 | 2.42 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 09 | view details |
IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | 2.7243 | N | $ 10,500 | $ 4,701 | 2.23 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 10 | view details |
USE SOLAR HEAT TO MAKE ELECTRICTY | 2.9114 | N | $ 1,035,000 | $ 33,730 | 30.68 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||