| Assessment Year | 2010 |
|---|---|
| SIC | 2851 |
| SIC Description | Paints And Allied Products |
| NAICS | 325510 |
| NAICS Description | Paint and Coating Manufacturing |
| Principal Product | Latex Paints |
| Sales | $ 100,000,000 |
| # of Employees | 110 |
| Plant Area (Sq.Ft.) | 178,000 |
| Annual Production | 15,000 Thousand Gallons |
| Production Hrs. Annual | 6,240 |
| Location (State) | DE |
| Yearly Energy Cost | $ 485,338 |
| Energy Sources | Yearly Usage | Yearly Cost | Unit Price |
|---|---|---|---|
Electricity |
4,935,386 kWh | $ 364,447 | $ 0.074 /kWh |
- Demand Charge |
987 kW | $ 31,085 | $ 31.49 /kW |
- Electricity Fees |
- | $ 0 | - |
Natural Gas |
5,998 MMBtu | $ 89,806 | $ 14.97 /MMBtu |
TOTAL ENERGY |
56,586 MMBtu | $ 485,338 | $ 8.58 /MMBtu |
|
Recommended Implemented |
| Energy Sources | Yearly Savings | Yearly Cost | % Saved | Unit Price |
|---|---|---|---|---|
Electricity |
1,297,312 kWh 1,178,232 kWh |
$ 104,338 $ 94,692 |
28.63 % 25.98 % |
$ 0.074 /kWh |
- Demand Charge |
0 kW 0 kW |
$ 0 $ 0 |
0.00 % 0.00 % |
$ 31.49 /kW |
- Electricity Fees |
- |
$ 0 $ 0 |
0.00 % 0.00 % |
- |
Natural Gas |
4,043 MMBtu 4,043 MMBtu |
$ 60,482 $ 60,482 |
67.35 % 67.35 % |
$ 14.97 /MMBtu |
TOTAL ENERGY |
17,340 MMBtu 16,120 MMBtu |
$ 164,820 $ 155,174 |
33.96 % 31.97 % |
$ 8.58 /MMBtu |
| AR # | Description | ARC Code | Status | Cost | Savings | Payback (Years) |
|||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 01 | view details |
REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | 2.4231 | N | $ 50 | $ 3,599 | 0.01 | ||||||||||||
|
|||||||||||||||||||
| 02 | view details |
ESTABLISH EQUIPMENT MAINTENANCE SCHEDULE | 2.6124 | I | $ 1,500 | $ 35,889 | 0.04 | ||||||||||||
|
|||||||||||||||||||
| 03 | view details |
ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | 2.4236 | I | $ 2,000 | $ 43,192 | 0.05 | ||||||||||||
|
|||||||||||||||||||
| 04 | view details |
ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS | 2.1231 | I | $ 1,000 | $ 7,180 | 0.14 | ||||||||||||
|
|||||||||||||||||||
| 05 | view details |
REPAIR OR REPLACE STEAM TRAPS | 2.2113 | I | $ 2,500 | $ 17,413 | 0.14 | ||||||||||||
|
|||||||||||||||||||
| 06 | view details |
INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | 2.4221 | N | $ 2,180 | $ 5,857 | 0.37 | ||||||||||||
|
|||||||||||||||||||
| 07 | view details |
UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | 2.7142 | I | $ 30,000 | $ 51,500 | 0.58 | ||||||||||||
|
|||||||||||||||||||
| 08 | view details |
DE-ENERGIZE EXCESS TRANSFORMER CAPACITY | 2.3512 | N | $ 435 | $ 190 | 2.29 | ||||||||||||
|
|||||||||||||||||||