Industrial Assessment Centers
Assessment #DL0033
| Assessment Year | 2009 |
|---|---|
| SIC | 2311 |
| SIC Description | Men's and Boys' Suits, Coats, and Overcoats |
| NAICS | 315222 |
| NAICS Description | Men's and Boys' Cut and Sew Suit, Coat, and Overcoat Manufacturing |
| Principal Product | Men’s Tailored Clothing |
| Sales | $ 53,000,000 |
| # of Employees | 385 |
| Plant Area (Sq.Ft.) | 65,000 |
| Annual Production | 70,000 Pieces |
| Production Hrs. Annual | 6,240 |
| Location (State) | MD |
| Yearly Energy Cost | $ 342,041 |
Current Energy Usage & Costs
| Energy Sources | Yearly Usage | Yearly Cost | Unit Price |
|---|---|---|---|
Electricity |
1,709,400 kWh | $ 232,756 | $ 0.136 /kWh |
- Electricity Fees |
- | $ 0 | - |
Natural Gas |
10,989 MMBtu | $ 109,285 | $ 9.94 /MMBtu |
TOTAL ENERGY |
28,510 MMBtu | $ 342,041 | $ 12.00 /MMBtu |
Recommended Reduction in Usage & Costs
|
Recommended Implemented |
| Energy Sources | Yearly Savings | Yearly Cost | % Saved | Unit Price |
|---|---|---|---|---|
Electricity |
157,411 kWh 157,385 kWh |
$ 25,117 $ 21,521 |
10.79 % 9.25 % |
$ 0.136 /kWh |
- Electricity Fees |
- |
$ 0 $ 0 |
0.00 % 0.00 % |
- |
Natural Gas |
589 MMBtu 589 MMBtu |
$ 5,828 $ 5,828 |
5.33 % 5.33 % |
$ 9.94 /MMBtu |
TOTAL ENERGY |
2,203 MMBtu 2,203 MMBtu |
$ 30,945 $ 27,349 |
9.05 % 8.00 % |
$ 12.00 /MMBtu |
Recommendations
| AR # | Description | ARC Code | Status | Cost | Savings | Payback (Years) |
|||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 01 | view details |
USE MINIMUM STEAM OPERATING PRESSURE | 2.2163 | I | $ 0 | $ 1,091 | 0.00 | ||||||||||||
|
|||||||||||||||||||
| 02 | view details |
AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM | 2.7228 | I | $ 9,300 | $ 5,409 | 1.72 | ||||||||||||
|
|||||||||||||||||||
| 03 | view details |
USE ADJUSTABLE FREQUENCY DRIVE TO REPLACE THROTTLING SYSTEM | 2.4143 | I | $ 16,100 | $ 8,789 | 1.83 | ||||||||||||
|
|||||||||||||||||||
| 04 | view details |
ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | 2.1233 | I | $ 10,000 | $ 4,737 | 2.11 | ||||||||||||
|
|||||||||||||||||||
| 05 | view details |
UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | 2.7142 | I | $ 80 | $ 580 | 0.14 | ||||||||||||
|
|||||||||||||||||||
| 06 | view details |
UPGRADE CONTROLS ON COMPRESSORS | 2.4224 | N | $ 12,500 | $ 3,596 | 3.48 | ||||||||||||
|
|||||||||||||||||||
| 07 | view details |
INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | 2.4221 | I | $ 150 | $ 310 | 0.48 | ||||||||||||
|
|||||||||||||||||||
| 08 | view details |
USE PLANT OWNED TRANSFORMERS OR LEASE TRANSFORMERS | 2.3511 | I | $ 26,980 | $ 6,433 | 4.19 | ||||||||||||
|
|||||||||||||||||||