| Assessment Year | 2008 |
|---|---|
| SIC | 2086 |
| SIC Description | Bottled And Canned Soft Drinks |
| NAICS | 312111 |
| NAICS Description | Soft Drink Manufacturing |
| Principal Product | Pepsi, Mountain Dew, Diet versions, Pepsi One, Jazz, Sierra Mist, Pepsi |
| Sales | $ 160,000,000 |
| # of Employees | 400 |
| Plant Area (Sq.Ft.) | 600,000 |
| Annual Production | 25,000,000 Pieces |
| Production Hrs. Annual | 6,656 |
| Location (State) | MD |
| Yearly Energy Cost | $ 1,439,422 |
Current Energy Usage & Costs
| Energy Sources | Yearly Usage | Yearly Cost | Unit Price |
|---|---|---|---|
Electricity |
10,041,460 kWh | $ 882,895 | $ 0.088 /kWh |
- Demand Charge |
1,904 kW | $ 4,398 | $ 2.31 /kW |
- Electricity Fees |
- | $ 48,317 | - |
Natural Gas |
55,954 MMBtu | $ 503,812 | $ 9.00 /MMBtu |
TOTAL ENERGY |
158,879 MMBtu | $ 1,439,422 | $ 9.06 /MMBtu |
Water Disposal |
62,812,000 Gal | $ 147,488 | $ 0 /Gal |
Recommended Reduction in Usage & Costs
|
Recommended Implemented |
| Energy Sources | Yearly Savings | Yearly Cost | % Saved | Unit Price |
|---|---|---|---|---|
Electricity |
641,272 kWh 537,760 kWh |
$ 71,486 $ 59,065 |
8.10 % 6.69 % |
$ 0.088 /kWh |
- Demand Charge |
0 kW 0 kW |
$ 0 $ 0 |
0.00 % 0.00 % |
$ 2.31 /kW |
- Electricity Fees |
- |
$ 0 $ 0 |
0.00 % 0.00 % |
- |
Natural Gas |
31,953 MMBtu 1,200 MMBtu |
$ 287,546 $ 10,800 |
57.07 % 2.14 % |
$ 9.00 /MMBtu |
TOTAL ENERGY |
38,527 MMBtu 6,713 MMBtu |
$ 359,032 $ 69,865 |
24.94 % 4.85 % |
$ 9.06 /MMBtu |
Water Disposal |
0 Gal 0 Gal |
$ 0 $ 0 |
0.00 % 0.00 % |
$ 0 /Gal |
Recommendations
| AR # | Description | ARC Code | Status | Cost | Savings | Payback (Years) |
|||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 01 | view details |
RECOVER HEAT FROM REFRIGERATION CONDENSERS | 2.2436 | N | $ 150,000 | $ 160,536 | 0.93 | ||||||||||||
|
|||||||||||||||||||
| 02 | view details |
REPLACE BOILER | 2.1224 | N | $ 102,000 | $ 116,210 | 0.88 | ||||||||||||
|
|||||||||||||||||||
| 03 | view details |
ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | 2.4236 | I | $ 11,000 | $ 21,865 | 0.50 | ||||||||||||
|
|||||||||||||||||||
| 04 | view details |
UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | 2.4111 | N | $ 3,877 | $ 12,421 | 0.31 | ||||||||||||
|
|||||||||||||||||||
| 05 | view details |
REPAIR LEAKS IN LINES AND VALVES | 2.2133 | I | $ 1,200 | $ 10,800 | 0.11 | ||||||||||||
|
|||||||||||||||||||
| 06 | view details |
USE MULTIPLE SPEED MOTORS OR AFD FOR VARIABLE PUMP, BLOWER AND COMPRESSOR LOADS | 2.4141 | I | $ 112,000 | $ 37,200 | 3.01 | ||||||||||||
|
|||||||||||||||||||