| Assessment Year | 2008 |
|---|---|
| SIC | 2082 |
| SIC Description | Malt Beverages |
| NAICS | 312120 |
| NAICS Description | Breweries |
| Principal Product | Beer |
| Sales | $ 10,000,000 |
| # of Employees | 50 |
| Plant Area (Sq.Ft.) | 50,000 |
| Annual Production | 180,000 Pieces |
| Production Hrs. Annual | 8,766 |
| Location (State) | DE |
| Yearly Energy Cost | $ 329,829 |
Current Energy Usage & Costs
| Energy Sources | Yearly Usage | Yearly Cost | Unit Price |
|---|---|---|---|
Electricity |
180,008 kWh | $ 14,029 | $ 0.078 /kWh |
- Demand Charge |
383 kW | $ 2,800 | $ 7.31 /kW |
- Electricity Fees |
- | $ 0 | - |
Other Energy |
16,200 MMBtu | $ 313,000 | $ 19.32 /MMBtu |
TOTAL ENERGY |
18,045 MMBtu | $ 329,829 | $ 18.28 /MMBtu |
Recommended Reduction in Usage & Costs
|
Recommended Implemented |
| Energy Sources | Yearly Savings | Yearly Cost | % Saved | Unit Price |
|---|---|---|---|---|
Electricity |
248,938 kWh 248,938 kWh |
$ 23,119 $ 23,119 |
164.79 % 164.79 % |
$ 0.078 /kWh |
- Demand Charge |
25,000 kW 25,000 kW |
$ 2,400 $ 2,400 |
85.71 % 85.71 % |
$ 7.31 /kW |
- Electricity Fees |
- |
$ 0 $ 0 |
0.00 % 0.00 % |
- |
Other Energy |
3,606 MMBtu 306 MMBtu |
$ 71,281 $ 5,911 |
22.77 % 1.89 % |
$ 19.32 /MMBtu |
TOTAL ENERGY |
6,158 MMBtu 2,858 MMBtu |
$ 96,800 $ 31,430 |
29.35 % 9.53 % |
$ 18.28 /MMBtu |
Recommendations
| AR # | Description | ARC Code | Status | Cost | Savings | Payback (Years) |
|||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 01 | view details |
USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT COMBUSTION AIR | 2.2411 | N | $ 400 | $ 20,000 | 0.02 | ||||||||||||
|
|||||||||||||||||||
| 02 | view details |
INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | 2.4221 | I | $ 3,500 | $ 2,400 | 1.46 | ||||||||||||
|
|||||||||||||||||||
| 03 | view details |
USE ADJUSTABLE FREQUENCY DRIVE TO REPLACE MECHANICAL DRIVE | 2.4144 | I | $ 20,000 | $ 19,500 | 1.03 | ||||||||||||
|
|||||||||||||||||||
| 04 | view details |
ADD AREA LIGHTING SWITCHES | 2.7131 | I | $ 1,500 | $ 370 | 4.05 | ||||||||||||
|
|||||||||||||||||||
| 05 | view details |
INSULATE STEAM / HOT WATER LINES | 2.2131 | I | $ 2,500 | $ 5,911 | 0.42 | ||||||||||||
|
|||||||||||||||||||
| 06 | view details |
USE FLUE GAS HEAT TO PREHEAT BOILER FEEDWATER | 2.2412 | N | $ 16,000 | $ 14,000 | 1.14 | ||||||||||||
|
|||||||||||||||||||
| 07 | view details |
REPLACE BOILER | 2.1224 | N | $ 20,000 | $ 13,000 | 1.54 | ||||||||||||
|
|||||||||||||||||||
| 08 | view details |
USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | 2.1243 | N | $ 27,000 | $ 15,400 | 1.75 | ||||||||||||
|
|||||||||||||||||||
| 09 | view details |
USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER | 2.2425 | N | $ 10,000 | $ 2,970 | 3.37 | ||||||||||||
|
|||||||||||||||||||
| 10 | view details |
UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | 2.7142 | I | $ 18,000 | $ 3,249 | 5.54 | ||||||||||||
|
|||||||||||||||||||