| Assessment Year | 2009 |
|---|---|
| SIC | 2542 |
| SIC Description | Partitions And Fixtures, Except Wood |
| NAICS | 337215 |
| NAICS Description | Showcase, Partition, Shelving, and Locker Manufacturing |
| Principal Product | Metal lockers |
| Sales | $ 16,400,000 |
| # of Employees | 130 |
| Plant Area (Sq.Ft.) | 110,000 |
| Annual Production | 34,000 Pieces |
| Production Hrs. Annual | 4,160 |
| Location (State) | CO |
| Yearly Energy Cost | $ 379,380 |
| Energy Sources | Yearly Usage | Yearly Cost | Unit Price |
|---|---|---|---|
Electricity |
2,067,800 kWh | $ 183,856 | $ 0.089 /kWh |
- Demand Charge |
5,943 kW | $ 35,658 | $ 6.00 /kW |
- Electricity Fees |
- | $ 0 | - |
Natural Gas |
14,565 MMBtu | $ 159,866 | $ 10.98 /MMBtu |
TOTAL ENERGY |
35,760 MMBtu | $ 379,380 | $ 10.61 /MMBtu |
|
Recommended Implemented |
| Energy Sources | Yearly Savings | Yearly Cost | % Saved | Unit Price |
|---|---|---|---|---|
Electricity |
251,800 kWh 209,300 kWh |
$ 22,180 $ 18,440 |
12.06 % 10.03 % |
$ 0.089 /kWh |
- Demand Charge |
671 kW 643 kW |
$ 4,020 $ 3,850 |
11.27 % 10.80 % |
$ 6.00 /kW |
- Electricity Fees |
- |
$ 0 $ 0 |
0.00 % 0.00 % |
- |
Natural Gas |
593 MMBtu 593 MMBtu |
$ 6,050 $ 6,050 |
3.78 % 3.78 % |
$ 10.98 /MMBtu |
TOTAL ENERGY |
3,174 MMBtu 2,739 MMBtu |
$ 32,250 $ 28,340 |
8.50 % 7.47 % |
$ 10.61 /MMBtu |
| AR # | Description | ARC Code | Status | Cost | Savings | Payback (Years) |
|||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 01 | view details |
ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | 2.4236 | I | $ 890 | $ 8,830 | 0.10 | ||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||
| 02 | view details |
INSULATE BARE EQUIPMENT | 2.2511 | I | $ 1,730 | $ 6,050 | 0.29 | ||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||
| 03 | view details |
ELIMINATE OR REDUCE COMPRESSED AIR USED FOR COOLING, AGITATING LIQUIDS, MOVING PRODUCT, OR DRYING | 2.4232 | N | $ 110 | $ 1,010 | 0.11 | ||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||
| 04 | view details |
UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | 2.7142 | I | $ 4,590 | $ 6,150 | 0.75 | ||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||
| 05 | view details |
UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | 2.7142 | I | $ 21,150 | $ 4,160 | 5.08 | ||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||
| 06 | view details |
UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | 2.7142 | I | $ 12,240 | $ 3,830 | 3.20 | ||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||
| 07 | view details |
USE PHOTOCELL CONTROLS | 2.7134 | N | $ 210 | $ 1,920 | 0.11 | ||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||
| 08 | view details |
INSTALL OCCUPANCY SENSORS | 2.7135 | N | $ 1,360 | $ 1,150 | 1.18 | ||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||