Industrial Assessment Centers
Assessment #CO0551
| Assessment Year | 2004 |
|---|---|
| SIC | 3728 |
| SIC Description | Aircraft Parts And Equipment, Nec |
| NAICS | 336413 |
| NAICS Description | Other Aircraft Parts and Auxiliary Equipment Manufacturing |
| Principal Product | Aircraft fuselage |
| Sales | $ 4,000,000 |
| # of Employees | 300 |
| Plant Area (Sq.Ft.) | 52,000 |
| Annual Production | 6 Pieces |
| Production Hrs. Annual | 2,808 |
| Location (State) | NM |
| Yearly Energy Cost | $ 113,930 |
Current Energy Usage & Costs
| Energy Sources | Yearly Usage | Yearly Cost | Unit Price |
|---|---|---|---|
Electricity |
1,387,800 kWh | $ 96,901 | $ 0.070 /kWh |
- Demand Charge |
2,868 kW | $ 9,785 | $ 3.41 /kW |
- Electricity Fees |
- | $ 2,062 | - |
Natural Gas |
667 MMBtu | $ 5,182 | $ 7.77 /MMBtu |
TOTAL ENERGY |
14,892 MMBtu | $ 113,930 | $ 7.65 /MMBtu |
Recommended Reduction in Usage & Costs
|
Recommended Implemented |
| Energy Sources | Yearly Savings | Yearly Cost | % Saved | Unit Price |
|---|---|---|---|---|
Electricity |
150,700 kWh 21,700 kWh |
$ 11,900 $ 1,770 |
12.28 % 1.83 % |
$ 0.070 /kWh |
- Demand Charge |
448 kW 93 kW |
$ 1,810 $ 370 |
18.50 % 3.78 % |
$ 3.41 /kW |
- Electricity Fees |
- |
$ 0 $ 0 |
0.00 % 0.00 % |
- |
Natural Gas |
176 MMBtu 0 MMBtu |
$ 1,340 $ 0 |
25.86 % 0.00 % |
$ 7.77 /MMBtu |
TOTAL ENERGY |
1,721 MMBtu 222 MMBtu |
$ 15,050 $ 2,140 |
13.21 % 1.88 % |
$ 7.65 /MMBtu |
Recommendations
| AR # | Description | ARC Code | Status | Cost | Savings | Payback (Years) |
|||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 01 | view details |
RECOVER HEAT FROM AIR COMPRESSOR | 2.2434 | N | $ 4,280 | $ 1,340 | 3.19 | ||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||
| 02 | view details |
REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | 2.4231 | I | $ 60 | $ 1,230 | 0.05 | ||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||
| 03 | view details |
ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | 2.4236 | I | $ 320 | $ 910 | 0.35 | ||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||
| 04 | view details |
USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | 2.4323 | N | $ 750 | $ 190 | 3.95 | ||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||
| 05 | view details |
UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | 2.7142 | N | $ 13,550 | $ 11,300 | 1.20 | ||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||
| 06 | view details |
INSTALL OCCUPANCY SENSORS | 2.7135 | N | $ 300 | $ 510 | 0.59 | ||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||
| 07 | view details |
INSTALL OCCUPANCY SENSORS | 2.7135 | N | $ 390 | $ 140 | 2.79 | ||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||