Industrial Assessment Centers
Assessment #CO0529
| Assessment Year | 2003 |
|---|---|
| SIC | 3341 |
| SIC Description | Secondary Nonferrous Metals |
| NAICS | 331492 |
| NAICS Description | Secondary Smelting, Refining, and Alloying of Nonferrous Metal (except Copper and Aluminum) |
| Principal Product | Hard surfacing and brazing alloys |
| Sales | $ 17,000,000 |
| # of Employees | 44 |
| Plant Area (Sq.Ft.) | 52,767 |
| Annual Production | 2,160,000 Pounds |
| Production Hrs. Annual | 3,120 |
| Location (State) | NM |
| Yearly Energy Cost | $ 324,995 |
Current Energy Usage & Costs
| Energy Sources | Yearly Usage | Yearly Cost | Unit Price |
|---|---|---|---|
Electricity |
2,317,200 kWh | $ 104,254 | $ 0.045 /kWh |
- Demand Charge |
16,950 kW | $ 125,914 | $ 7.43 /kW |
- Electricity Fees |
- | $ 68,988 | - |
Natural Gas |
4,430 MMBtu | $ 25,839 | $ 5.83 /MMBtu |
TOTAL ENERGY |
28,181 MMBtu | $ 324,995 | $ 11.53 /MMBtu |
Recommended Reduction in Usage & Costs
|
Recommended Implemented |
| Energy Sources | Yearly Savings | Yearly Cost | % Saved | Unit Price |
|---|---|---|---|---|
Electricity |
191,973 kWh 63,173 kWh |
$ 9,207 $ 2,977 |
8.83 % 2.86 % |
$ 0.045 /kWh |
- Demand Charge |
4,459 kW 3,909 kW |
$ 51,278 $ 44,958 |
40.72 % 35.71 % |
$ 7.43 /kW |
- Electricity Fees |
- |
$ 0 $ 0 |
0.00 % 0.00 % |
- |
Natural Gas |
0 MMBtu 0 MMBtu |
$ 0 $ 0 |
0.00 % 0.00 % |
$ 5.83 /MMBtu |
TOTAL ENERGY |
1,968 MMBtu 648 MMBtu |
$ 60,485 $ 47,935 |
18.61 % 14.75 % |
$ 11.53 /MMBtu |
Recommendations
| AR # | Description | ARC Code | Status | Cost | Savings | Payback (Years) |
|||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 01 | view details |
RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | 2.3131 | I | $ 7,000 | $ 41,400 | 0.17 | ||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||
| 02 | view details |
COOL COMPRESSOR AIR INTAKE WITH HEAT EXCHANGER | 2.4234 | N | $ 5,060 | $ 5,520 | 0.92 | ||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||
| 03 | view details |
UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | 2.7142 | N | $ 16,530 | $ 4,790 | 3.45 | ||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||
| 04 | view details |
SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING | 2.4237 | I | $ 3,920 | $ 3,810 | 1.03 | ||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||
| 05 | view details |
ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | 2.4236 | I | $ 190 | $ 2,090 | 0.09 | ||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||
| 06 | view details |
ELIMINATE OR REDUCE COMPRESSED AIR USED FOR COOLING, AGITATING LIQUIDS, MOVING PRODUCT, OR DRYING | 2.4232 | N | $ 4,000 | $ 1,240 | 3.23 | ||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||
| 07 | view details |
UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | 2.7142 | I | $ 128 | $ 386 | 0.33 | ||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||
| 08 | view details |
USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | 2.4133 | I | $ 250 | $ 218 | 1.15 | ||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||
| 09 | view details |
UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | 2.4111 | N | $ 1,440 | $ 460 | 3.13 | ||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||