Industrial Assessment Centers
Assessment #CO0498
| Assessment Year | 2001 |
|---|---|
| SIC | 3563 |
| SIC Description | Air And Gas Compressors |
| NAICS | |
| NAICS Description | |
| Principal Product | Natural gas compressors and wheelchair lifts |
| Sales | $ 22,000,000 |
| # of Employees | 60 |
| Plant Area (Sq.Ft.) | 56,600 |
| Annual Production | 35 Pieces |
| Production Hrs. Annual | 2,496 |
| Location (State) | CO |
| Yearly Energy Cost | $ 104,240 |
Current Energy Usage & Costs
| Energy Sources | Yearly Usage | Yearly Cost | Unit Price |
|---|---|---|---|
Electricity |
798,400 kWh | $ 13,321 | $ 0.017 /kWh |
- Demand Charge |
2,868 kW | $ 38,803 | $ 13.53 /kW |
- Electricity Fees |
- | $ 196 | - |
Natural Gas |
7,072 MMBtu | $ 51,920 | $ 7.34 /MMBtu |
TOTAL ENERGY |
15,256 MMBtu | $ 104,240 | $ 6.83 /MMBtu |
Recommended Reduction in Usage & Costs
|
Recommended Implemented |
| Energy Sources | Yearly Savings | Yearly Cost | % Saved | Unit Price |
|---|---|---|---|---|
Electricity |
78,700 kWh 78,700 kWh |
$ 1,320 $ 1,320 |
9.91 % 9.91 % |
$ 0.017 /kWh |
- Demand Charge |
620 kW 332 kW |
$ 8,350 $ 4,470 |
21.52 % 11.52 % |
$ 13.53 /kW |
- Electricity Fees |
- |
$ 0 $ 0 |
0.00 % 0.00 % |
- |
Natural Gas |
879 MMBtu 510 MMBtu |
$ 5,020 $ 2,910 |
9.67 % 5.60 % |
$ 7.34 /MMBtu |
TOTAL ENERGY |
1,686 MMBtu 1,317 MMBtu |
$ 14,690 $ 8,700 |
14.09 % 8.35 % |
$ 6.83 /MMBtu |
Recommendations
| AR # | Description | ARC Code | Status | Cost | Savings | Payback (Years) |
|||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 01 | view details |
USE DEMAND CONTROLLER OR LOAD SHEDDER | 2.3191 | N | $ 7,000 | $ 3,880 | 1.80 | ||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||
| 02 | view details |
LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | 2.7221 | I | $ 5,800 | $ 2,910 | 1.99 | ||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||
| 03 | view details |
INSTALL AIR SEALS AROUND TRUCK LOADING DOCK DOORS | 2.7443 | N | $ 7,530 | $ 2,110 | 3.57 | ||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||
| 04 | view details |
UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | 2.7142 | I | $ 0 | $ 410 | 0.00 | ||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||
| 05 | view details |
ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | 2.4236 | I | $ 210 | $ 380 | 0.55 | ||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||
| 06 | view details |
RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS | 4.5130 | I | $ 3,200 | $ 71,500 | 0.04 | ||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||