Industrial Assessment Centers
Assessment #CO0301
| Assessment Year | 1994 |
|---|---|
| SIC | 3671 |
| SIC Description | Electron Tubes |
| NAICS | |
| NAICS Description | |
| Principal Product | Satellite and Aircraft Products |
| Sales | $ 50,000,000 |
| # of Employees | 230 |
| Plant Area (Sq.Ft.) | 250,000 |
| Annual Production | 7 Pieces |
| Production Hrs. Annual | 2,340 |
| Location (State) | CO |
| Yearly Energy Cost | $ 283,020 |
Current Energy Usage & Costs
| Energy Sources | Yearly Usage | Yearly Cost | Unit Price |
|---|---|---|---|
Electricity |
3,957,503 kWh | $ 230,760 | $ 0.058 /kWh |
- Electricity Fees |
- | $ 0 | - |
Natural Gas |
13,434 MMBtu | $ 52,260 | $ 3.89 /MMBtu |
TOTAL ENERGY |
53,998 MMBtu | $ 283,020 | $ 5.24 /MMBtu |
Recommended Reduction in Usage & Costs
|
Recommended Implemented |
| Energy Sources | Yearly Savings | Yearly Cost | % Saved | Unit Price |
|---|---|---|---|---|
Electricity |
210,727 kWh 54,807 kWh |
$ 8,940 $ 3,190 |
3.87 % 1.38 % |
$ 0.058 /kWh |
- Electricity Fees |
- |
$ 0 $ 0 |
0.00 % 0.00 % |
- |
Natural Gas |
0 MMBtu 0 MMBtu |
$ 0 $ 0 |
0.00 % 0.00 % |
$ 3.89 /MMBtu |
TOTAL ENERGY |
2,160 MMBtu 562 MMBtu |
$ 8,940 $ 3,190 |
3.16 % 1.13 % |
$ 5.24 /MMBtu |
Recommendations
| AR # | Description | ARC Code | Status | Cost | Savings | Payback (Years) |
|||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 01 | view details |
UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | 2.7142 | I | $ 6,000 | $ 2,620 | 2.29 | ||||||||||||
|
|||||||||||||||||||
| 02 | view details |
USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | 2.4133 | N | $ 7,250 | $ 2,510 | 2.89 | ||||||||||||
|
|||||||||||||||||||
| 03 | view details |
UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM | 2.7252 | N | $ 6,000 | $ 2,270 | 2.64 | ||||||||||||
|
|||||||||||||||||||
| 04 | view details |
USE MULTIPLE SPEED MOTORS OR AFD FOR VARIABLE PUMP, BLOWER AND COMPRESSOR LOADS | 2.4141 | N | $ 2,270 | $ 570 | 3.98 | ||||||||||||
|
|||||||||||||||||||
| 05 | view details |
ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | 2.4236 | I | $ 310 | $ 570 | 0.54 | ||||||||||||
|
|||||||||||||||||||
| 06 | view details |
INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | 2.4221 | N | $ 470 | $ 400 | 1.18 | ||||||||||||
|
|||||||||||||||||||