Industrial Assessment Centers
Assessment #BS0001
| Assessment Year | 2012 |
|---|---|
| SIC | 2086 |
| SIC Description | Bottled And Canned Soft Drinks |
| NAICS | 312111 |
| NAICS Description | Soft Drink Manufacturing |
| Principal Product | Carbonated Soft Drinks |
| Sales | $ 60,000,000 |
| # of Employees | 140 |
| Plant Area (Sq.Ft.) | 250,000 |
| Annual Production | 10,350 Thousand Gallons |
| Production Hrs. Annual | 2,480 |
| Location (State) | ID |
| Yearly Energy Cost | $ 284,081 |
Current Energy Usage & Costs
| Energy Sources | Yearly Usage | Yearly Cost | Unit Price |
|---|---|---|---|
Electricity |
2,870,555 kWh | $ 84,942 | $ 0.030 /kWh |
- Demand Charge |
12,446 kW | $ 51,928 | $ 4.17 /kW |
- Electricity Fees |
- | $ 41,829 | - |
Natural Gas |
13,161 MMBtu | $ 105,383 | $ 8.01 /MMBtu |
TOTAL ENERGY |
42,584 MMBtu | $ 284,081 | $ 6.67 /MMBtu |
Water Disposal |
21,361,636 Gal | $ 57,000 | $ 0 /Gal |
Recommended Reduction in Usage & Costs
|
Recommended Implemented |
| Energy Sources | Yearly Savings | Yearly Cost | % Saved | Unit Price |
|---|---|---|---|---|
Electricity |
301,048 kWh 72,018 kWh |
$ 9,428 $ 2,238 |
11.10 % 2.63 % |
$ 0.030 /kWh |
- Demand Charge |
0 kW 0 kW |
$ 0 $ 0 |
0.00 % 0.00 % |
$ 4.17 /kW |
- Electricity Fees |
- |
$ 0 $ 0 |
0.00 % 0.00 % |
- |
Natural Gas |
3,812 MMBtu 3,812 MMBtu |
$ 27,833 $ 27,833 |
26.41 % 26.41 % |
$ 8.01 /MMBtu |
TOTAL ENERGY |
6,898 MMBtu 4,550 MMBtu |
$ 37,261 $ 30,071 |
13.12 % 10.59 % |
$ 6.67 /MMBtu |
Water Disposal |
0 Gal 0 Gal |
$ 0 $ 0 |
0.00 % 0.00 % |
$ 0 /Gal |
Recommendations
| AR # | Description | ARC Code | Status | Cost | Savings | Payback (Years) |
|||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 01 | view details |
INSULATE BARE EQUIPMENT | 2.2511 | I | $ 12,300 | $ 6,068 | 2.03 | ||||||||||||||||
|
|||||||||||||||||||||||
| 02 | view details |
IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | 2.7243 | I | $ 35,200 | $ 19,506 | 1.80 | ||||||||||||||||
|
|||||||||||||||||||||||
| 03 | view details |
REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | 2.7224 | I | $ 0 | $ 1,703 | 0.00 | ||||||||||||||||
|
|||||||||||||||||||||||
| 04 | view details |
USE / PURCHASE OPTIMUM SIZED COMPRESSOR | 2.4226 | N | $ 1,722 | $ 3,865 | 0.45 | ||||||||||||||||
|
|||||||||||||||||||||||
| 05 | view details |
ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | 2.4236 | I | $ 1,616 | $ 1,664 | 0.97 | ||||||||||||||||
|
|||||||||||||||||||||||
| 06 | view details |
MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | 2.7124 | I | $ 200 | $ 1,034 | 0.19 | ||||||||||||||||
|
|||||||||||||||||||||||
| 07 | view details |
UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | 2.7142 | I | $ 160 | $ 96 | 1.67 | ||||||||||||||||
|
|||||||||||||||||||||||
| 08 | view details |
USE MULTIPLE SPEED MOTORS OR AFD FOR VARIABLE PUMP, BLOWER AND COMPRESSOR LOADS | 2.4141 | N | $ 4,800 | $ 3,325 | 1.44 | ||||||||||||||||
|
|||||||||||||||||||||||