Industrial Assessment Centers
Assessment #BD0406
| Assessment Year | 2012 |
|---|---|
| SIC | 2099 |
| SIC Description | Food Preparations, Nec |
| NAICS | 311991 |
| NAICS Description | Perishable Prepared Food Manufacturing |
| Principal Product | Heat and serve entrees |
| Sales | $ 30,000,000 |
| # of Employees | 85 |
| Plant Area (Sq.Ft.) | 30,578 |
| Annual Production | 85,000,000 Pounds |
| Production Hrs. Annual | 3,756 |
| Location (State) | IL |
| Yearly Energy Cost | $ 231,316 |
Current Energy Usage & Costs
| Energy Sources | Yearly Usage | Yearly Cost | Unit Price |
|---|---|---|---|
Electricity |
2,361,263 kWh | $ 107,931 | $ 0.046 /kWh |
- Demand Charge |
5,913 kW | $ 26,623 | $ 4.50 /kW |
- Electricity Fees |
- | $ 23,944 | - |
Natural Gas |
9,970 MMBtu | $ 72,818 | $ 7.30 /MMBtu |
TOTAL ENERGY |
34,173 MMBtu | $ 231,316 | $ 6.77 /MMBtu |
Water Disposal |
5,249,464 Gal | $ 26,781 | $ 0 /Gal |
Recommended Reduction in Usage & Costs
|
Recommended Implemented |
| Energy Sources | Yearly Savings | Yearly Cost | % Saved | Unit Price |
|---|---|---|---|---|
Electricity |
903,867 kWh 96,693 kWh |
$ 42,005 $ 4,419 |
38.92 % 4.09 % |
$ 0.046 /kWh |
- Demand Charge |
747 kW 233 kW |
$ 3,359 $ 1,047 |
12.62 % 3.93 % |
$ 4.50 /kW |
- Electricity Fees |
- |
$ 0 $ 0 |
0.00 % 0.00 % |
- |
Natural Gas |
5,106 MMBtu 1,255 MMBtu |
$ 37,293 $ 9,166 |
51.21 % 12.59 % |
$ 7.30 /MMBtu |
TOTAL ENERGY |
14,371 MMBtu 2,246 MMBtu |
$ 82,657 $ 14,632 |
35.73 % 6.33 % |
$ 6.77 /MMBtu |
Water Disposal |
0 Gal 0 Gal |
$ 0 $ 0 |
0.00 % 0.00 % |
$ 0 /Gal |
Recommendations
| AR # | Description | ARC Code | Status | Cost | Savings | Payback (Years) |
|||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 01 | view details |
INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | 2.7447 | N | $ 4,573 | $ 31,639 | 0.14 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 02 | view details |
RECOVER HEAT FROM AIR COMPRESSOR | 2.2434 | N | $ 800 | $ 15,397 | 0.05 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 03 | view details |
DIRECT WARMEST AIR TO COMBUSTION INTAKE | 2.1213 | N | $ 10,000 | $ 12,730 | 0.79 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 04 | view details |
USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT COMBUSTION AIR | 2.2411 | I | $ 3,000 | $ 8,394 | 0.36 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 05 | view details |
USE MORE EFFICIENT LIGHT SOURCE | 2.7143 | N | $ 7,591 | $ 4,151 | 1.83 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 06 | view details |
ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | 2.4236 | I | $ 500 | $ 3,404 | 0.15 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 07 | view details |
COOL COMPRESSOR AIR INTAKE WITH HEAT EXCHANGER | 2.4234 | N | $ 9,400 | $ 2,394 | 3.93 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 08 | view details |
USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | 2.4133 | N | $ 3,350 | $ 2,126 | 1.58 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 09 | view details |
UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | 2.7142 | N | $ 2,736 | $ 1,962 | 1.39 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 10 | view details |
INSTALL OCCUPANCY SENSORS | 2.7135 | I | $ 1,350 | $ 1,808 | 0.75 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 11 | view details |
INSTALL TURBULATORS | 2.1222 | I | $ 1,500 | $ 772 | 1.94 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 12 | view details |
INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | 2.4221 | N | $ 150 | $ 434 | 0.35 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 13 | view details |
REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | 2.4231 | I | $ 10 | $ 254 | 0.04 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 14 | view details |
RECOVER AND REUSE COOLING WATER | 3.4115 | N | $ 2,200 | $ 15,696 | 0.14 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||