| Assessment Year | 2010 |
|---|---|
| SIC | 2672 |
| SIC Description | Paper Coated And Laminated, Nec |
| NAICS | 322222 |
| NAICS Description | Coated and Laminated Paper Manufacturing |
| Principal Product | Pressure Sensitive Tapes |
| Sales | $ 17,000,000 |
| # of Employees | 60 |
| Plant Area (Sq.Ft.) | 185,000 |
| Annual Production | 185 Pieces |
| Production Hrs. Annual | 7,488 |
| Location (State) | IL |
| Yearly Energy Cost | $ 1,023,089 |
| Energy Sources | Yearly Usage | Yearly Cost | Unit Price |
|---|---|---|---|
Electricity |
6,325,200 kWh | $ 255,344 | $ 0.040 /kWh |
- Demand Charge |
13,897 kW | $ 194,569 | $ 14.00 /kW |
- Electricity Fees |
- | $ 40,137 | - |
Natural Gas |
73,887 MMBtu | $ 533,039 | $ 7.21 /MMBtu |
TOTAL ENERGY |
138,721 MMBtu | $ 1,023,089 | $ 7.38 /MMBtu |
Water Disposal |
4,863,000 Gal | $ 16,486 | $ 0 /Gal |
|
Recommended Implemented |
| Energy Sources | Yearly Savings | Yearly Cost | % Saved | Unit Price |
|---|---|---|---|---|
Electricity |
7,562 kWh 7,562 kWh |
$ 305 $ 305 |
0.12 % 0.12 % |
$ 0.040 /kWh |
- Demand Charge |
4,810 kW 10 kW |
$ 67,345 $ 145 |
34.61 % 0.07 % |
$ 14.00 /kW |
- Electricity Fees |
- |
$ 0 $ 0 |
0.00 % 0.00 % |
- |
Natural Gas |
35,465 MMBtu 31,187 MMBtu |
$ 246,340 $ 218,752 |
46.21 % 41.04 % |
$ 7.21 /MMBtu |
TOTAL ENERGY |
35,543 MMBtu 31,265 MMBtu |
$ 313,990 $ 219,202 |
30.69 % 21.43 % |
$ 7.38 /MMBtu |
Water Disposal |
0 Gal 0 Gal |
$ 0 $ 0 |
0.00 % 0.00 % |
$ 0 /Gal |
| AR # | Description | ARC Code | Status | Cost | Savings | Payback (Years) |
|||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 01 | view details |
REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES | 2.1221 | I | $ 51,500 | $ 105,011 | 0.49 | ||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||
| 02 | view details |
RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | 2.3131 | N | $ 125 | $ 67,200 | 0.00 | ||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||
| 03 | view details |
RECOVER WASTE HEAT FROM EQUIPMENT | 2.2437 | I | $ 70,000 | $ 62,913 | 1.11 | ||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||
| 04 | view details |
RECOVER WASTE HEAT FROM EQUIPMENT | 2.2437 | I | $ 34,000 | $ 39,238 | 0.87 | ||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||
| 05 | view details |
INSTALL TURBULATORS | 2.1222 | N | $ 4,350 | $ 20,378 | 0.21 | ||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||
| 06 | view details |
ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | 2.1233 | I | $ 5,500 | $ 11,590 | 0.47 | ||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||
| 07 | view details |
USE RADIANT HEATER FOR SPOT HEATING | 2.7231 | N | $ 9,000 | $ 7,210 | 1.25 | ||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||
| 08 | view details |
UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | 2.7142 | I | $ 1,727 | $ 989 | 1.75 | ||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||