Industrial Assessment Centers
Assessment #AR0129
| Assessment Year | 1997 |
|---|---|
| SIC | 2015 |
| SIC Description | Poultry Slaughtering And Processing |
| NAICS | |
| NAICS Description | |
| Principal Product | Whole Fresh and Frozen Turkeys |
| Sales | $ 27,000,000 |
| # of Employees | 485 |
| Plant Area (Sq.Ft.) | 116,000 |
| Annual Production | 166,083,646 Pounds |
| Production Hrs. Annual | 2,210 |
| Location (State) | AR |
| Yearly Energy Cost | $ 763,476 |
Current Energy Usage & Costs
| Energy Sources | Yearly Usage | Yearly Cost | Unit Price |
|---|---|---|---|
Electricity |
19,296,894 kWh | $ 397,055 | $ 0.021 /kWh |
- Demand Charge |
43,516 kW | $ 186,425 | $ 4.28 /kW |
- Electricity Fees |
- | $ 0 | - |
Natural Gas |
71,577 MMBtu | $ 179,996 | $ 2.51 /MMBtu |
TOTAL ENERGY |
269,370 MMBtu | $ 763,476 | $ 2.83 /MMBtu |
Water Disposal |
29,796,400 Gal | $ 263,658 | $ 0 /Gal |
Solid Waste (non-haz) |
2,520,000 lbs | $ 39,010 | $ 0 /lbs |
Recommended Reduction in Usage & Costs
|
Recommended Implemented |
| Energy Sources | Yearly Savings | Yearly Cost | % Saved | Unit Price |
|---|---|---|---|---|
Electricity |
19,051 kWh 106,976 kWh |
$ -2,176 $ 1,387 |
-0.55 % 0.35 % |
$ 0.021 /kWh |
- Demand Charge |
192 kW 183 kW |
$ 821 $ 784 |
0.44 % 0.42 % |
$ 4.28 /kW |
- Electricity Fees |
- |
$ 0 $ 0 |
0.00 % 0.00 % |
- |
Natural Gas |
0 MMBtu 0 MMBtu |
$ 0 $ 0 |
0.00 % 0.00 % |
$ 2.51 /MMBtu |
TOTAL ENERGY |
1,985 MMBtu 1,096 MMBtu |
$ 3,140 $ 2,171 |
0.41 % 0.28 % |
$ 2.83 /MMBtu |
Water Disposal |
6,363,700 Gal 2,652,000 Gal |
$ 11,454 $ 4,774 |
4.34 % 1.81 % |
$ 0 /Gal |
Solid Waste (non-haz) |
0 lbs 0 lbs |
$ 0 $ 0 |
0.00 % 0.00 % |
$ 0 /lbs |
Recommendations
| AR # | Description | ARC Code | Status | Cost | Savings | Payback (Years) |
|||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 01 | view details |
INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | 2.4221 | I | $ 180 | $ 491 | 0.37 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 02 | view details |
UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | 2.7142 | N | $ 81 | $ 130 | 0.62 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 03 | view details |
UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | 2.4111 | I | $ 0 | $ 1,085 | 0.00 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 04 | view details |
USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER | 2.2425 | N | $ 16,000 | $ 4,495 | 3.56 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 05 | view details |
RECOVER AND REUSE COOLING WATER | 3.4115 | N | $ 9,800 | $ 6,680 | 1.47 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 06 | view details |
USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE | 3.4156 | I | $ 200 | $ 5,369 | 0.04 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 07 | view details |
INSTALL AUTOMATIC PACKING EQUIPMENT | 4.4410 | N | $ 406,000 | $ 143,923 | 2.82 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 08 | view details |
INSTALL AUTOMATIC PACKING EQUIPMENT | 4.4410 | N | $ 597,000 | $ 123,344 | 4.84 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||