Industrial Assessment Centers
Assessment #AR0125
| Assessment Year | 1997 |
|---|---|
| SIC | 3621 |
| SIC Description | Motors And Generators |
| NAICS | |
| NAICS Description | |
| Principal Product | Fractional Horsepower A/C and D/C Motors |
| Sales | $ 40,000,000 |
| # of Employees | 325 |
| Plant Area (Sq.Ft.) | 90,000 |
| Annual Production | 6,000,000 Pieces |
| Production Hrs. Annual | 5,640 |
| Location (State) | AR |
| Yearly Energy Cost | $ 261,721 |
Current Energy Usage & Costs
| Energy Sources | Yearly Usage | Yearly Cost | Unit Price |
|---|---|---|---|
Electricity |
3,315,651 kWh | $ 94,470 | $ 0.028 /kWh |
- Demand Charge |
9,069 kW | $ 139,944 | $ 15.43 /kW |
- Electricity Fees |
- | $ 0 | - |
Natural Gas |
5,294 MMBtu | $ 27,307 | $ 5.16 /MMBtu |
TOTAL ENERGY |
39,279 MMBtu | $ 261,721 | $ 6.66 /MMBtu |
Water Disposal |
108,400 Gal | $ 1,312 | $ 0 /Gal |
Solid Waste (non-haz) |
564,000 lbs | $ 2,380 | $ 0 /lbs |
Recommended Reduction in Usage & Costs
|
Recommended Implemented |
| Energy Sources | Yearly Savings | Yearly Cost | % Saved | Unit Price |
|---|---|---|---|---|
Electricity |
114,596 kWh 9,672 kWh |
$ 2,530 $ -398 |
2.68 % -0.42 % |
$ 0.028 /kWh |
- Demand Charge |
36 kW 6 kW |
$ 4,937 $ 1,258 |
3.53 % 0.90 % |
$ 15.43 /kW |
- Electricity Fees |
- |
$ 0 $ 0 |
0.00 % 0.00 % |
- |
Natural Gas |
0 MMBtu 0 MMBtu |
$ 0 $ 0 |
0.00 % 0.00 % |
$ 5.16 /MMBtu |
TOTAL ENERGY |
1,174 MMBtu 99 MMBtu |
$ 7,467 $ 860 |
2.85 % 0.33 % |
$ 6.66 /MMBtu |
Water Disposal |
7,827,000 Gal 7,827,000 Gal |
$ 12,523 $ 12,523 |
954.50 % 954.50 % |
$ 0 /Gal |
Solid Waste (non-haz) |
0 lbs 0 lbs |
$ 0 $ 0 |
0.00 % 0.00 % |
$ 0 /lbs |
Recommendations
| AR # | Description | ARC Code | Status | Cost | Savings | Payback (Years) |
|||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 01 | view details |
UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | 2.7142 | N | $ 1,212 | $ 6,053 | 0.20 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 02 | view details |
REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | 2.7111 | I | $ 186 | $ 1,085 | 0.17 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 03 | view details |
USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | 2.4133 | N | $ 229 | $ 200 | 1.15 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 04 | view details |
UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | 2.4111 | N | $ 0 | $ 265 | 0.00 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 05 | view details |
ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | 2.4236 | I | $ 150 | $ 1,152 | 0.13 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 06 | view details |
OVERLAP CUSTODIAL SERVICES WITH NORMAL DAY HOURS | 2.3136 | N | $ 0 | $ 89 | 0.00 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 07 | view details |
RECOVER AND REUSE COOLING WATER | 3.4115 | I | $ 8,400 | $ 6,309 | 1.33 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 08 | view details |
RECOVER AND REUSE COOLING WATER | 3.4115 | I | $ 31,000 | $ 4,837 | 6.41 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 09 | view details |
RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS | 4.5130 | I | $ 2,000 | $ 31,334 | 0.06 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||
| 10 | view details |
RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS | 4.5130 | N | $ 1,000 | $ 4,700 | 0.21 | ||||||||||||||||||||
|
|||||||||||||||||||||||||||