| Assessment Year | 1993 |
|---|---|
| SIC | 3624 |
| SIC Description | Carbon And Graphite Products |
| NAICS | |
| NAICS Description | |
| Principal Product | Graphite Electrodes |
| Sales | $ 7,500,000 |
| # of Employees | 94 |
| Plant Area (Sq.Ft.) | 108,717 |
| Annual Production | 4,500 Tons |
| Production Hrs. Annual | 2,080 |
| Location (State) | AR |
| Yearly Energy Cost | $ 1,517,038 |
| Energy Sources | Yearly Usage | Yearly Cost | Unit Price |
|---|---|---|---|
Electricity |
20,121,044 kWh | $ 1,055,064 | $ 0.052 /kWh |
- Electricity Fees |
- | $ 0 | - |
Natural Gas |
187,519 MMBtu | $ 461,974 | $ 2.46 /MMBtu |
TOTAL ENERGY |
393,760 MMBtu | $ 1,517,038 | $ 3.85 /MMBtu |
|
Recommended Implemented |
| Energy Sources | Yearly Savings | Yearly Cost | % Saved | Unit Price |
|---|---|---|---|---|
Electricity |
221,277 kWh 188,159 kWh |
$ 11,605 $ 9,866 |
1.10 % 0.94 % |
$ 0.052 /kWh |
- Electricity Fees |
- |
$ 0 $ 0 |
0.00 % 0.00 % |
- |
Natural Gas |
1,292 MMBtu 1,292 MMBtu |
$ 2,232 $ 2,232 |
0.48 % 0.48 % |
$ 2.46 /MMBtu |
TOTAL ENERGY |
3,560 MMBtu 3,221 MMBtu |
$ 13,837 $ 12,098 |
0.91 % 0.80 % |
$ 3.85 /MMBtu |
| AR # | Description | ARC Code | Status | Cost | Savings | Payback (Years) |
|||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 01 | view details |
INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | 2.4221 | I | $ 230 | $ 2,244 | 0.10 | ||||||||||||
|
|||||||||||||||||||
| 02 | view details |
ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | 2.4236 | I | $ 620 | $ 7,622 | 0.08 | ||||||||||||
|
|||||||||||||||||||
| 03 | view details |
SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | 2.4132 | N | $ 600 | $ 1,739 | 0.35 | ||||||||||||
|
|||||||||||||||||||
| 04 | view details |
REPAIR AND ELIMINATE STEAM LEAKS | 2.2135 | I | $ 475 | $ 1,845 | 0.26 | ||||||||||||
|
|||||||||||||||||||
| 05 | view details |
ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | 2.1233 | I | $ 1,000 | $ 387 | 2.58 | ||||||||||||
|
|||||||||||||||||||