Industrial Assessment Centers
Assessment #AM0082
| Assessment Year | 1990 |
|---|---|
| SIC | 3537 |
| SIC Description | Industrial Trucks And Tractors |
| NAICS | |
| NAICS Description | |
| Principal Product | HYDRAULIC EQUIPMENT |
| Sales | $ 11,000,000 |
| # of Employees | 125 |
| Plant Area (Sq.Ft.) | 0 |
| Annual Production | 1,500 Pieces |
| Production Hrs. Annual | 4,692 |
| Location (State) | TX |
| Yearly Energy Cost | $ 172,452 |
Current Energy Usage & Costs
| Energy Sources | Yearly Usage | Yearly Cost | Unit Price |
|---|---|---|---|
Electricity |
1,997,655 kWh | $ 119,791 | $ 0.060 /kWh |
- Electricity Fees |
- | $ 0 | - |
Natural Gas |
10,135 MMBtu | $ 48,561 | $ 4.79 /MMBtu |
Fuel Oil #1 |
500 MMBtu | $ 4,100 | $ 8.20 /MMBtu |
TOTAL ENERGY |
31,111 MMBtu | $ 172,452 | $ 5.54 /MMBtu |
Recommended Reduction in Usage & Costs
|
Recommended Implemented |
| Energy Sources | Yearly Savings | Yearly Cost | % Saved | Unit Price |
|---|---|---|---|---|
Electricity |
167,058 kWh 249,121 kWh |
$ 7,856 $ 11,646 |
6.56 % 9.72 % |
$ 0.060 /kWh |
- Electricity Fees |
- |
$ 0 $ 0 |
0.00 % 0.00 % |
- |
Natural Gas |
1,071 MMBtu -499 MMBtu |
$ 5,129 $ -2,391 |
10.56 % -4.92 % |
$ 4.79 /MMBtu |
Fuel Oil #1 |
499 MMBtu 499 MMBtu |
$ 5,215 $ 5,215 |
127.20 % 127.20 % |
$ 8.20 /MMBtu |
TOTAL ENERGY |
3,282 MMBtu 2,553 MMBtu |
$ 18,200 $ 14,470 |
10.55 % 8.39 % |
$ 5.54 /MMBtu |
Recommendations
| AR # | Description | ARC Code | Status | Cost | Savings | Payback (Years) |
|||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 01 | view details |
UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | 2.7121 | I | $ 14,110 | $ 6,080 | 2.32 | ||||||||||||||||
|
|||||||||||||||||||||||
| 02 | view details |
ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | 2.4236 | I | $ 2,000 | $ 3,360 | 0.60 | ||||||||||||||||
|
|||||||||||||||||||||||
| 03 | view details |
USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT COMBUSTION AIR | 2.2411 | N | $ 12,000 | $ 3,730 | 3.22 | ||||||||||||||||
|
|||||||||||||||||||||||
| 04 | view details |
RESCHEDULE AND REARRANGE MULTIPLE-SOURCE HEATING SYSTEMS | 2.7291 | I | $ 2,150 | $ 2,824 | 0.76 | ||||||||||||||||
|
|||||||||||||||||||||||
| 05 | view details |
REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | 2.4231 | I | $ 0 | $ 1,380 | 0.00 | ||||||||||||||||
|
|||||||||||||||||||||||
| 06 | view details |
UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | 2.7142 | I | $ 208 | $ 206 | 1.01 | ||||||||||||||||
|
|||||||||||||||||||||||
| 07 | view details |
INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | 2.4221 | I | $ 600 | $ 620 | 0.97 | ||||||||||||||||
|
|||||||||||||||||||||||