| 3. | WASTE MINIMIZATION / POLLUTION PREVENTION |
|---|
| ARC | Description | Times Recc'd |
Average Savings |
Average Payback (Years) |
Implementation % |
Map |
|---|---|---|---|---|---|---|
| 3.1xxx | Operations | 1,024 | $64,136 | 0.9 | 40.84% | Map |
| 3.2xxx | Equipment | 468 | $58,277 | 0.8 | 36.18% | Map |
| 3.3xxx | Post Generation Treatment / Minimization | 401 | $49,098 | 1.6 | 28.65% | Map |
| 3.4xxx | Water Use | 2,117 | $16,202 | 1.4 | 42.61% | Map |
| 3.5xxx | Recycling | 2,821 | $18,369 | 1.0 | 44.69% | Map |
| 3.6xxx | Waste Disposal | 1,345 | $19,341 | 4.6 | 30.72% | Map |
| 3.7xxx | Maintenance | 527 | $16,733 | 0.6 | 42.40% | Map |
| 3.8xxx | Raw Materials | 475 | $14,014 | 1.2 | 30.94% | Map |