| 2. | ENERGY MANAGEMENT |
|---|
| ARC | Description | Times Recc'd |
Average Savings |
Average Payback (Years) |
Implementation % |
Map |
|---|---|---|---|---|---|---|
| 2.1xxx | Combustion Systems | 5 | $2,749 | 2.2 | 20.00% | Map |
| 2.2xxx | Thermal Systems | 8 | $13,838 | 1.3 | 12.50% | Map |
| 2.3xxx | Electrical Power | 4 | $5,427 | 2.1 | 50.00% | Map |
| 2.4xxx | Motor Systems | 17 | $544 | 0.9 | 23.53% | Map |
| 2.5xxx | Industrial Design | 1 | $167 | 0.7 | 100.00% | Map |
| 2.6xxx | Operations | 7 | $1,617 | 0.3 | 71.43% | Map |
| 2.7xxx | Building and Grounds | 48 | $4,691 | 1.7 | 37.50% | Map |
| 2.8xxx | Ancillary Costs | 1 | $10,912 | 0.0 | 0.00% | Map |
| 2.9xxx | Alternative Energy Usage | 0 | $0 | 0.0 | 0.00% | Map |